FIELD: construction.
SUBSTANCE: invention relates to hydraulic engineering and can be used in construction and operation of ravine-type waste water storage. Superstructure contains upper 1 and lower 2 enclosing dams, an alluvial section with surface slope 3 and settling pond 4, water-discharge wells 5 with water discharge headers 6 and a hydroelectric power plant 10 with hydroelectric units 11 and 12 mounted outside enclosure 2. Inside the prefabricated structure water ducts 7 and 8 are installed, which are connected to hydroelectric units 11 and 12 of hydroelectric power station 10. Water supply manifolds 6 are connected to water duct 7 from water discharge wells 5 in settling pond 4, and water conduit 8 is connected to hydraulic unit 12, which drains water from surface water accumulation pond 9 behind top enclosing dam 1.
EFFECT: higher reliability and efficiency of alluvial structure.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ALLUVIAL STRUCTURE | 2021 |
|
RU2776299C1 |
METHOD FOR ERECTING AGGRADATIONAL STRUCTURE | 2020 |
|
RU2748474C1 |
METHOD FOR ERECTION OF ALLUVIAL STRUCTURE | 2021 |
|
RU2769435C1 |
METHOD FOR ERECTION OF ALLUVIAL STRUCTURE | 2024 |
|
RU2825332C1 |
HYDRAULIC SLUICING | 2023 |
|
RU2811441C1 |
METHOD FOR RECULTIVATION OF INWASH TAILINGS POND ADJACENT TO SLOPE | 2009 |
|
RU2403389C1 |
RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 |
|
RU2409743C1 |
WASHED IN COLLECTOR OF WASTES ADJACENT TO SLOPE, METHOD FOR ITS MANUFACTURING AND METHOD OF ITS RECLAMATION | 2009 |
|
RU2398066C1 |
METHOD OF ERECTION OF EARTH WORKS | 0 |
|
SU1671764A1 |
COMPARTMENT OF SLUDGE POND FOR INDUSTRIAL ENTERPRISES WASTES, METHOD OF ITS DEVELOPMENT AND METHOD OF ITS PRESERVATION | 2009 |
|
RU2385987C1 |
Authors
Dates
2020-03-17—Published
2019-05-06—Filed