FIELD: hydraulic engineering.
SUBSTANCE: used in the construction and operation of alluvial waste storage facilities. In an alluvial structure, including the enclosing dams of the primary 1 and build-up tiers 2, pulp outlets 3, alluvium sections as part of the above-water slope 4 and settling pond 5, an impervious screen 6, a surcharge 7, according to the invention, a surcharge 7 of the downstream slope and the crests of the dams of the build-up tiers 2, backfilled from waste, is made on top of the impervious screen 6 in the form of a holding rigid fastening, resting on the stop 9 in the primary dam 1.
EFFECT: improving the reliability of the alluvial structure and the efficiency of filling its useful capacity.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF ALLUVIAL STRUCTURE | 2024 |
|
RU2825332C1 |
METHOD FOR ERECTING AGGRADATIONAL STRUCTURE | 2020 |
|
RU2748474C1 |
METHOD FOR ERECTION OF ALLUVIAL STRUCTURE | 2021 |
|
RU2769435C1 |
ALLUVIAL STRUCTURE | 2021 |
|
RU2776299C1 |
ALLUVIAL STRUCTURE | 2019 |
|
RU2717042C1 |
COMPARTMENT OF SLUDGE POND OF INDUSTRIAL ENTERPRISES WASTES | 2009 |
|
RU2385988C1 |
METHOD OF ERECTION OF ALLUVIAL WATERWORKS | 2015 |
|
RU2612205C2 |
METHOD FOR SCREEN OF WATER-PERMEABLE SIDES OF HYDRAULIC FILL BASIN | 0 |
|
SU1728345A1 |
METHOD OF ERECTING HYDRAULICALLY DEPOSITED STRUCTURE | 0 |
|
SU1458484A1 |
ALLUVIAL HYDRAULIC STRUCTURE | 2020 |
|
RU2742145C1 |
Authors
Dates
2024-01-11—Published
2023-06-23—Filed