FIELD: construction.
SUBSTANCE: invention relates to construction, namely, to foundations for wind-driven power plants. Foundation for the wind-driven power plant contains a round or polygonal base to support the tower of the wind-driven power plant and several ribs extending radially from the base. Base is divided into several peripheral sections; at that, each peripheral section and rib are made as a whole unit in the form of ready concrete element; at that, ready concrete elements are made of reinforced concrete containing the first reinforcing structure, in particular, reinforcing rods built in ready concrete elements. There is a second reinforcing structure which holds ready concrete elements together and which is connected to the first reinforcing structure, wherein the first reinforcing structure and the second reinforcement structure are directly connected to each other.
EFFECT: technical result consists in ensuring the reliability of the foundation at high static and dynamic loads, high resistance to tilting torque.
17 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
FOUNDATION FOR WIND-DRIVEN POWER PLANT | 2017 |
|
RU2714745C1 |
FOUNDATION FOR WIND POWER PLANT | 2019 |
|
RU2782228C2 |
FOUNDATION FOR WIND POWER PLANT | 2019 |
|
RU2782015C2 |
DEVICE FOR PRODUCTION OF REINFORCING FRAMES FOR SEGMENTS OF TOWERS, IN PARTICULAR FOR SEGMENTS OF WINDMILL TOWERS | 2013 |
|
RU2586125C1 |
DEVICE AND METHOD FOR ANCHORAGE WIND-DRIVEN POWER PLANT | 2012 |
|
RU2594841C2 |
FOUNDATION FOR WIND TURBINE TOWERS | 2019 |
|
RU2794278C2 |
WIND-DRIVEN POWER PLANT TOWER BASE SECTION | 2012 |
|
RU2611086C2 |
ANCHOR, TENSIONING DEVICE, WIND POWER PLANT AND METHOD OF TENSIONING STRETCH CORDS ON ANCHOR | 2013 |
|
RU2632610C2 |
METHOD FOR WIND TURBINE OPERATION | 2014 |
|
RU2640462C2 |
REINFORCEMENT OF VERTICAL PILES MADE IN SOIL AND PERCEIVING INDENTATION LOADS | 2010 |
|
RU2465403C2 |
Authors
Dates
2020-04-28—Published
2017-02-01—Filed