FIELD: construction.
SUBSTANCE: invention relates to construction, specifically to reinforcement or replacement of building structures. Set of reinforcement works consists of several successive stages, including works for reinforcement of support zones and inner panels of posts, framing of stiffness rib holder, enlarging support zone of external panels of posts, increased support area of roofing trays, decommissioning of damaged internal panels of posts and lifting of reinforced concrete structures to design position, reinforcement of strap beams, roofing plates and fixation of external panels.
EFFECT: technical result is possibility to perform repair and restoration works without disassembly of reinforced concrete building structures and removal of building from operation.
8 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SPRENGEL REINFORCEMENT OF SPAN STRUCTURE | 2023 |
|
RU2804484C1 |
BUILDING STRUCTURE | 2023 |
|
RU2811091C1 |
METHOD FOR STRENGTHENING STRUCTURE OF METAL CHIMNEYS | 2021 |
|
RU2758826C1 |
DEVICE FOR RESTORING THE DESIGN POSITION OF THE OUTER WALL PANEL OF THE ATTIC OF A LARGE-PANEL BUILDING | 2021 |
|
RU2758824C1 |
METHOD OF BUILDING-UP OF HOUSES AND INDUSTRIAL BUILDINGS FROM BUILDING BLOCKS AND WALL REINFORCED CONCRETE SLABS AND DEVICE FOR ITS IMPLEMENTATION | 2007 |
|
RU2360075C2 |
COLLAPSIBLE RAILWAY PLATFORM AND METHOD OF MOVEMENT THEREOF | 2019 |
|
RU2725972C1 |
GROUND ANCHOR AND METHOD OF ITS INSTALLATION | 2023 |
|
RU2809404C1 |
COMPLETE DELIVERED BUILDING | 2014 |
|
RU2567797C1 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
EARTHQUAKE-RESISTANT BUILDING | 2007 |
|
RU2340751C1 |
Authors
Dates
2020-07-02—Published
2020-02-05—Filed