FIELD: mining.
SUBSTANCE: group of inventions relates to mining and can be used in construction and repair of wells for various purpose. Method of waterproofing of annular space consists in that a hose is pumped into the annular space between the well wall and the casing pipe and a backfill mixture is pumped through the hose. For pumping two-channel hose with mixing chamber is used at the end, in process of pumping hose is lifted with rate of rise of level of formed material of waterproofing in annular space. When pumping into one channel of hose one component of grouting mixture is supplied – mixture of fly ash and water in weight ratio of 1:1 to 1.6:1, and another channel is supplied with another component of plugging mixture – hydroactive polyurethane resin, with following ratio of components, wt%: mixture of fly ash and water 88–94, hydroactive polyurethane resin 6–12.
EFFECT: improved quality and reduced duration of waterproofing of annular space and reduced consumption of grouting mixture and reduced fire hazard.
6 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
MAGNETIC GRANULATED POLYMER COMPOSITION AND METHOD OF ITS USE FOR INTELLIGENT CEMENTING OF WELLS OF CASING STRING | 2019 |
|
RU2712585C1 |
METHOD OF CEMENTING CASING STRING IN WELL | 2023 |
|
RU2823955C1 |
METHOD FOR PREVENTING OCCURRENCE OF INTER-CASING AND INTER-LAYER FLOWS IN WELL | 2023 |
|
RU2808074C1 |
METHOD FOR WATERPROOFING ANNULAR SPACE OF PROCESS WELLS | 2023 |
|
RU2819860C1 |
ESTIMATION METHOD OF THE QUALITY OF WELL CEMENTING IN LOW-TEMPERATURE ROCKS | 2017 |
|
RU2652777C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2018 |
|
RU2684932C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
Authors
Dates
2020-07-09—Published
2019-12-16—Filed