FIELD: oil industry.
SUBSTANCE: invention relates to oil submersible equipment and can be used in systems of bypass pumping units bypass as improved Y-Tool. Device comprises, on one side, two branches for connection of submersible pump unit and string of bypass pipes and common output on opposite side in head of Y-unit. Inside Y-unit with possibility of alternate overlapping of branches there is a back-folding internal check valve in form of disc. Back-folding internal check valve is equipped with a spring and fixed by means of an axis on a separate body, which is mounted in a branch with a connected string of bypass pipes. Along the periphery of the disk end surface external relative to the separate housing there is a projection in the form of a hollow segment of the canopy. Top of hollow segment of canopy is oriented upwards, and open cavity is directed towards disk axis.
EFFECT: improving operating reliability of the plant and enabling shutoff and sealing of the branch of the bypass pipes string at small flows of liquid flow.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
Y-SHAPED DEVICE FOR SUBMERSIBLE PUMPING UNIT | 2020 |
|
RU2731447C1 |
BYPASS SYSTEM OF PUMPING UNIT | 2017 |
|
RU2654301C1 |
METHOD OF PUMPING UNIT BYPASSING AND BYPASSING SYSTEM FOR ITS IMPLEMENTATION | 2010 |
|
RU2449117C1 |
PUMP UNIT BYPASS SYSTEM | 2012 |
|
RU2520556C2 |
PUMPING UNIT BYPASS SYSTEM | 2021 |
|
RU2771682C1 |
BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR DUAL PUMPING OF WELL HAVING AT LEAST TWO FORMATIONS, BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR SINGLE AND MULTIPLE ZONE WELLS AND BY-PASSING METHOD FOR WELL SURVEY | 2012 |
|
RU2495280C1 |
METHOD OF DELIVERING A TOOL TO A SEAT IN Y-SHAPED BYPASS DEVICES OF A SUBMERSIBLE PUMP UNIT AND A GEOPHYSICAL PLUG FOR ITS IMPLEMENTATION | 2023 |
|
RU2820227C1 |
METHOD OF DUAL COMPLETION OF MULTIPLE-ZONE WELL | 2011 |
|
RU2491415C2 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
METHOD OF DUAL COMPLETION OF SEVERAL PRODUCTIVE HORIZONS AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2449114C1 |
Authors
Dates
2020-08-26—Published
2020-02-25—Filed