FIELD: oil and gas industry; mining.
SUBSTANCE: invention relates to oil submersible equipment and can be used to lift a borehole fluid and measure well parameters without extracting the pumping unit. Bypass system contains a Y-block with a plug. To the first output of the block, a string of bypass pipes is suspended through a branch pipe, a connector and a cutoff clutch; to the second – a pumping unit containing an electric motor with a support branch pipe is connected through a branch pipe, a cutoff clutch and a balancing valve. Bypass pipe string and pumping unit are interconnected by protictolizers and a seat fixing the support branch pipe. Connector is made telescopic and equipped with a locking element in two directions. On the top of the Y-block there is a landing nipple, intended for installation of a pressure test plug or an insulating sleeve. Bypass pipes along the whole pumping unit are made solid and connected by a gas-tight inserted joint.
EFFECT: invention is aimed at improving the reliability and safety of operation of the pumping unit, including through the possibility of carrying out pressure testing of pipes, at increasing the load-carrying capacity of the bypass system, as well as at ensuring the possibility of the free-flow oil production method.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PUMPING UNIT BYPASSING AND BYPASSING SYSTEM FOR ITS IMPLEMENTATION | 2010 |
|
RU2449117C1 |
PUMPING UNIT BYPASS SYSTEM | 2021 |
|
RU2771682C1 |
PUMP UNIT BYPASS SYSTEM | 2012 |
|
RU2520556C2 |
Y-SHAPED BYPASS DEVICE OF SUBMERSIBLE PUMPING UNIT | 2020 |
|
RU2730907C1 |
Y-SHAPED DEVICE FOR SUBMERSIBLE PUMPING UNIT | 2020 |
|
RU2731447C1 |
BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR DUAL PUMPING OF WELL HAVING AT LEAST TWO FORMATIONS, BY-PASS SYSTEM OF OIL WELL PUMPING UNIT FOR SINGLE AND MULTIPLE ZONE WELLS AND BY-PASSING METHOD FOR WELL SURVEY | 2012 |
|
RU2495280C1 |
METHOD OF DELIVERING A TOOL TO A SEAT IN Y-SHAPED BYPASS DEVICES OF A SUBMERSIBLE PUMP UNIT AND A GEOPHYSICAL PLUG FOR ITS IMPLEMENTATION | 2023 |
|
RU2820227C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
Authors
Dates
2018-05-17—Published
2017-08-07—Filed