FIELD: oil, gas and coke-chemical industries.
SUBSTANCE: invention relates to oil and gas industry, mainly to production equipment, namely to design of well completion equipment, which is installed in well after drilling, wherein completion includes filters, packers, suspensions and other equipment. Fixation of elements on pipe used in production of components of well completion equipment includes lower clamping ring and upper fixing ring. Fixation ring is ring with minimum inner diameter smaller than outer diameter at clamping ring in free state, and clamping ring is made with possibility of reduction of diameter when fixing ring is put on it.
EFFECT: higher force required to break the attachment, higher strength at bending loads, easier completion.
9 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL PROBLEM SECTIONS ELIMINATION | 2014 |
|
RU2555686C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
WELL REPEATED COMPLETION METHOD USING GRAVEL PACKING | 2017 |
|
RU2679772C2 |
METHOD FOR MANUFACTURE OF FILTER | 2020 |
|
RU2748554C1 |
METHOD FOR DETERMINATION OF TIGHTNESS OF COLUMN AND SHANKS | 2019 |
|
RU2730228C1 |
SYSTEMS FOR NON-PENETRATING PRODUCTIVE RESERVOIR CONTROL | 2004 |
|
RU2320859C1 |
SELF-CONTAINED UNIT OF FLUID FLOW CONTROL IN HORIZONTAL WELL | 2014 |
|
RU2558083C1 |
METHOD OF EQUALIZING FLUID WHEN INJECTING | 2016 |
|
RU2643377C1 |
CARTRIDGE-TYPE DOWNHOLE FILTER | 2019 |
|
RU2725448C1 |
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCTION OR INJECTION BOREHOLES | 2017 |
|
RU2658697C1 |
Authors
Dates
2020-08-28—Published
2019-10-28—Filed