FIELD: oil and gas industry.
SUBSTANCE: at implementation of the method, along the whole length of the well at the outlet from the wellbore into the annular space and further into the formation, equal hydraulic resistances to the flow is set, which exceed hydraulic resistance when fluid is moving through the wellbore and also resistance of fluid injection into the formation, which depends on rock properties.
EFFECT: uniform distribution of the flow of fluid injected into the formation along the wellbore for optimum production of reserves with a significant simplification of the inflow control devices.
8 cl
Title | Year | Author | Number |
---|---|---|---|
STAND-ALONE DEVICE FOR CONTROLLING FLUID FLOW IN WELL | 2016 |
|
RU2633598C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCTION OR INJECTION BOREHOLES | 2017 |
|
RU2658697C1 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
MONITORING METHOD FOR HORIZONTAL OR DIRECTIONAL PRODUCERS OR INJECTORS | 2013 |
|
RU2544923C1 |
MONITORING METHOD FOR HORIZONTAL AND DIRECTIONAL DEVELOPMENT OR INJECTION WELLS | 2015 |
|
RU2622974C2 |
METHOD FOR INCREASING EFFICIENCY OF OIL AND GAS PRODUCTION AT IMPLEMENTATION OF MULTI-STAGE HYDRAULIC FRACTURING | 2019 |
|
RU2702037C1 |
METHOD OF WELL PROBLEM SECTIONS ELIMINATION | 2014 |
|
RU2555686C1 |
METHOD FOR DETERMINATION OF TIGHTNESS OF COLUMN AND SHANKS | 2019 |
|
RU2730228C1 |
SELF-CONTAINED UNIT OF FLUID FLOW CONTROL IN HORIZONTAL WELL | 2014 |
|
RU2558083C1 |
Authors
Dates
2018-02-01—Published
2016-09-09—Filed