FIELD: oil and gas industry.
SUBSTANCE: method includes isolation of some well sections, and monitoring of their inflow. Preliminary place of the problem section is determined, and device is run in the well, at least closing zone of the problem section inside the first completion. The device contains isolating elements located above and/or below the problem section, elements of second completion and suspension. The isolating elements and suspension contain sealing devices, isolating along the internal surface of the well string.
EFFECT: increased efficiency of elimination of the problem sections upon simultaneous decreasing of the time expenses.
13 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD FOR INCREASING EFFICIENCY OF OIL AND GAS PRODUCTION AT IMPLEMENTATION OF MULTI-STAGE HYDRAULIC FRACTURING | 2019 |
|
RU2702037C1 |
METHOD FOR DETERMINING TIGHTNESS OF PACKERS | 2022 |
|
RU2800115C1 |
METHOD OF FITTING WELL FILTER IN HORIZONTAL WELL | 2012 |
|
RU2514040C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT OF HEAVY OIL OR BITUMEN WITH IMPLEMENTATION OF DOUBLE WELL HEAD HORIZONTAL WELLS | 2010 |
|
RU2431746C1 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
METHOD OF MULTISTAGE TREATMENT FOR STIMULATION OF MULTILATERAL WELL | 2010 |
|
RU2553705C2 |
METHOD OF RECOVERY OF VISCOUS AND BITUMEN-BEARING OILS IN THIN FORMATIONS | 1993 |
|
RU2082875C1 |
METHOD OF COMPLETION OF HORIZONTAL PRODUCTION WELL CONSTRUCTION WITH DEPOSIT INTERVAL HYDRAULIC FRACTURING | 2014 |
|
RU2564316C1 |
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL PRODUCER | 2012 |
|
RU2516062C1 |
Authors
Dates
2015-07-10—Published
2014-02-19—Filed