FIELD: information support of enterprises.
SUBSTANCE: method of managing an enterprise information system involves collecting, in an enterprise database management system, primary indicator values; calculating dependent indicators using values of primary factors and given calculation parameters, storing, in the enterprise database, information on user access levels to parameters and database objects; providing access to assignment of calculation parameters to users having corresponding access level, transmitting user-specified calculation parameters for storage in a database under condition of successful passage of testing possibility of using given calculation parameters for calculating a dependent indicator; checking user access rights to primary indicators and intermediate calculation results, and performing calculation parameters testing in case user has said rights.
EFFECT: simpler and safer procedures for creating and editing values of enterprise performance indicators, high security of information systems and separate data units used by enterprise information systems.
7 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF GENERATING REPORTS ON THE BASIC INDICATORS OF THE DISPLAY SYSTEM OF ENTERPRISE INDICATORS | 2020 |
|
RU2744625C1 |
CONTROL SYSTEM FOR THE PERFORMANCE INDICATORS OF THE ENTERPRISE | 2020 |
|
RU2736957C1 |
DEVICE FOR MANAGING INTELLECTUAL RESOURCES OF ENTERPRISE | 2015 |
|
RU2601135C1 |
SYSTEM FOR MANAGING ENTERPRISE INTELLECTUAL RESOURCES | 2015 |
|
RU2602972C2 |
SYSTEM FOR PROACTIVE MANAGEMENT OF ENTERPRISE | 2014 |
|
RU2584453C2 |
METHOD OF CREATING AUTOMATED INFORMATION SECURITY MANAGEMENT SYSTEMS AND A SYSTEM FOR IMPLEMENTING SAME | 2019 |
|
RU2717721C1 |
METHOD FOR ENTERING AND MULTILEVEL VERIFICATION OF INTENSIVELY SUPPLIED DATA IN LARGE SCIENTOMETRIC INFORMATION AND ANALYTICAL SYSTEMS | 2020 |
|
RU2763458C1 |
SYSTEM FOR OPTIMISING PROJECT WORKS | 2020 |
|
RU2756199C1 |
METHOD OF MANAGING THE ENTERPRISE AND AUTOMATION OF OPERATIONS AT THE ENTERPRISE | 2017 |
|
RU2651182C1 |
METHOD AND SYSTEM FOR CALCULATING INDEX OF RISK OF UNLAWFUL ACTIONS FROM CANDIDATES FOR EMPLOYMENT AND ACTING STAFF | 2018 |
|
RU2683190C1 |
Authors
Dates
2020-11-20—Published
2020-06-17—Filed