AIR HUMIDIFICATION SYSTEM OF HIGH-RISE BUILDING Russian patent published in 2020 - IPC F24F6/00 

Abstract RU 2737992 C1

FIELD: ventilation.

SUBSTANCE: invention relates to air conditioning equipment and is used to create comfortable microclimate conditions in high-rise buildings, in particular for maintaining air humidity in an apartment building, offices and other similar buildings at a sufficient level. Air humidification system of a high-rise building includes a water supply pipeline from a centralized water supply system, a water treatment station, from which central water supply line and drain water supply line of washing, central unit of system control, from central water supply line extend floor, high-pressure water lines which are looped for rinsing possibility, which are powered from high-pressure tower pumps, each of which is equipped with an individual control unit, connection of consumers is made to the floor water lines, each of which has its own hydraulic system, comprising spraying nozzles of adiabatic humidification, hydraulic fittings, distribution valves, hygrostats, room humidity control panel, maintaining the air humidity at the set level, monitoring and control of which operation is performed through the consumer control unit, wherein the central system control unit is configured to receive data from consumer control units and pump control units.

EFFECT: technical solution allows systematization and centralization of air humidification system of high-rise building with application of adiabatic atomising spraying of water under high division.

1 cl, 1 dwg

Similar patents RU2737992C1

Title Year Author Number
AIR HUMIDIFICATION SYSTEM OF HIGH-RISE BUILDING 2020
  • Novgorodov Ilia Aleksandrovich
RU2737989C1
ROOMS HUMIDIFICATION SYSTEM AND METHOD FOR CONTROL OF TECHNICAL PROBLEMS WITH THIS SYSTEM 2022
  • Novgorodov Ilia Aleksandrovich
RU2811873C1
HELIOTECHNICAL DEVICE FOR ELIMINATING BIOLOGICAL DARKNESS IN MULTISTOREY BUILDINGS 2008
RU2406942C2
HEATING AND HOT WATER SUPPLY SYSTEM OF FLATS OF MULTI-STORIED BUILDINGS 2010
  • Naumov Aleksandr Lavrent'Evich
  • Pechnikov Andrej Sergeevich
  • Seliverstov Jurij Mikhajlovich
  • Sotnikov Viktor Mikhajlovich
RU2438072C1
SYSTEM OF INTERNAL WATER SUPPLY AND INTERNAL SEWERAGE OF MULTISTORY BUILDING 2021
  • Troshchanovskij Anatolij Arkadevich
RU2789704C2
HEATING SYSTEM PRIMARILY FOR MULTISTORY BUILDINGS 1998
  • Novosel'Tsev B.P.
  • Khodyrev V.F.
  • Shafeeva E.B.
RU2148755C1
EJECTOR NATURAL VENTILATION FOR BUILDINGS 2007
  • Turulov Aleksandr Vladimirovich
RU2374567C2
MULTISTOREY ANIMAL HOUSE 0
  • Makshantsev Yurij Andreevich
  • Masiev Rustam Khajdarovich
  • Samigulin Anvar Abdullaevich
SU661091A1
MULTI STOREY RESIDENTIAL BUILDING 2017
  • Novokreshchenov Viktor Petrovich
  • Kozyl Aleksej Aleksandrovich
RU2653148C1
MULTIFUNCTIONAL BUILDING 2019
  • Denisenko Konstantin Vladimirovich
RU2730070C1

RU 2 737 992 C1

Authors

Novgorodov Ilia Aleksandrovich

Dates

2020-12-07Published

2020-05-21Filed