FIELD: electrical engineering.
SUBSTANCE: set task is achieved during change of simulator load from short circuit to point of maximum power takeoff CVC, wherein relative duration of main switch γmn open state current source is adjusted from 0 to 1 and the relative length of the open state of the bypass switch γbp = 0, and when changing load from point of maximum power to idle stroke CVC is adjusted γbp from 0 to 1 at γmn = 1, and when abrupt discharges - loads of load of simulator BS, switching of main and bypass switches is performed in second extended tolerance zone, note here that at load release and reduction of current value below lower level of first tolerance zone both said keys are opened, and when load is loaded and current value is increased above upper level of first zone both keys are locked.
EFFECT: technical result consists in improvement of reliability of solar battery simulator by reducing level of pulsations of short circuit current of simulator current source at sudden discharges - load surges.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROLLING THE KEYS OF A STABILISED CURRENT SOURCE IN AN ELECTRONIC SOLAR ARRAY SIMULATOR | 2021 |
|
RU2780971C1 |
SOLAR BATTERY TEST BOX | 2016 |
|
RU2625624C1 |
METHOD FOR TEST OF OPERATING ORDER OF SOLAR BATTERY HAVING N SECTIONS WHICH ARE MADE OF EQUAL UNITS, AND DEVICE FOR IMPLEMENTATION OF SAID METHOD | 1991 |
|
RU2012007C1 |
DEVICE FOR RECORDING CHARACTERISTICS OF SOLAR BATTERIES | 2008 |
|
RU2357264C1 |
SELF-CONTAINED POWER SUPPLY SYSTEM | 2005 |
|
RU2317216C2 |
DEVICE FOR CONTROLLING SOLAR-BATTERY EXCESS POWER | 2001 |
|
RU2211480C2 |
POWER SUPPLY SYSTEM | 1979 |
|
SU1840114A1 |
OFF-LINE POWER SUPPLY SYSTEM | 2005 |
|
RU2313169C2 |
SPACE VEHICLE POWER SUPPLY SYSTEM SIMULATION STAND | 2007 |
|
RU2349518C1 |
HIGH-VOLTAGE POWER SUPPLY SYSTEM OF SPACECRAFT | 2016 |
|
RU2650100C1 |
Authors
Dates
2021-02-05—Published
2020-07-03—Filed