FIELD: load-lifting cranes.
SUBSTANCE: crane with built-in node (10) for overcoming the dead position between primary (11) and secondary parts (12) of its working boom (1) contains at least a rigid supporting structure made with the possibility of attachment to the corresponding chassis and equipped with at least two telescopic support racks installed at least approximately vertically, and a rigid supporting mast, which in the area of its first end section is connected to the mentioned supporting structure. In the area of the second end section of the mast, working boom (1) is attached at point (91) of rotation, at which the mentioned boom is capable of rotation around the horizontal axis. Working boom (1) consists of primary part (11) and secondary part (12), which are pivotally connected to each other. Secondary part (12) in the area of mentioned point (92) of rotation is connected with the possibility of rotating around the horizontal axis with primary part (11) of working boom (1) by means of node (10) for overcoming the dead position. Node (10) contains rotary drive device (4), as well as mechanism (5) suitable for attaching that part of hydraulic cylinder (13) for rotating secondary part (12) relatively to primary part (11) of working boom (1), which can be attached to secondary part (12) of boom (1).
EFFECT: improvement in the design of the device is achieved.
6 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
JOURNAL AND SELF-PROPELLED LIFTING CRANE WITH SAID JOURNAL | 2009 |
|
RU2509712C2 |
SELF-PROPELLED HOISTING CRANE AND METHOD OF ITS ASSEMBLY (VERSIONS) | 2009 |
|
RU2509713C2 |
LIFTING CRANE AUTOMATICALLY FOLDING BOOM | 1992 |
|
RU2083473C1 |
PUMP SYSTEM AND METHOD FOR WELL RELIQUEFACTION | 2010 |
|
RU2540348C2 |
AUTOMATED MOUNTING CRANE WITH SELF-FOLDING BOOM | 1996 |
|
RU2161119C2 |
LIFTING CRANE WITH DISPLACING COUNTERWEIGHT | 2010 |
|
RU2556678C2 |
CONCRETE PUMP WITH PLACING BOOM | 2013 |
|
RU2638674C2 |
SELF-PROPELLED HOISTING CRANE AND METHOD OF ITS ASSEMBLY (VERSIONS) | 2008 |
|
RU2476371C2 |
CRANE-MANIPULATOR UNIT | 2002 |
|
RU2240971C2 |
SELF-PROPELLED CRANE AND METHOD OF ITS OPERATION | 2008 |
|
RU2467946C2 |
Authors
Dates
2021-07-22—Published
2018-06-29—Filed