FIELD: construction.
SUBSTANCE: invention relates to the field of construction and can be used mainly for reinforcing elements of foundations and foundations of structures, as well as supporting structures of bridges, overpasses, buildings and structures. The bored pile contains a monolithic concrete body with a metal reinforcing cage in the form of parallel longitudinal reinforcing bars, united by cross ties. The transverse links are made in the form of elements formed by polygonal clamps of reinforcing bars superimposed in pairs on each other with an angular rotation of their axes of symmetry relative to each other by an ½ angle α formed by adjacent axial lines passing through the center and opposite vertices of the polygonal clamps and connected in this position in contact points with knitting wire or welding.
EFFECT: increasing productivity during the erection of piles and making their frames, increasing the corrosion resistance and durability of the pile.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BORED PILE | 2023 |
|
RU2824116C1 |
BORED PILE WITH WIDENING | 2023 |
|
RU2824059C1 |
REINFORCEMENT BAR OF PERIODIC PROFILE | 2016 |
|
RU2680153C2 |
METHOD OF CONNECTING AUGER PILE WITH SOLID FLOOR OF UNDERGROUND STRUCTURE | 2017 |
|
RU2643231C1 |
LOST CAP FOR ERECTION OF BORED PILE | 2007 |
|
RU2353729C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
PREFABRICATED FOUNDATION MAT OF PILE FOUNDATION | 0 |
|
SU1518455A1 |
FOUNDATION FOR WIND-DRIVEN POWER PLANT | 2017 |
|
RU2714745C1 |
METHOD FOR BUILDING AND BUILDING STRUCTURE ERECTION, RENEWAL AND RECONSTRUCTION | 2005 |
|
RU2285771C1 |
LINING OF UNDERGROUND STRUCTURE FROM REINFORCED METAL BLOCKS | 2008 |
|
RU2378456C1 |
Authors
Dates
2021-10-04—Published
2021-03-04—Filed