DEVICE FOR CLEANING HORIZONTAL WELL BORE FROM SLURRY Russian patent published in 2021 - IPC E21B37/00 

Abstract RU 2757385 C1

FIELD: oil production.

SUBSTANCE: invention relates to the field of oil production and can be used to remove cuttings in a horizontal wellbore. The device contains a sludge trap and a system for delivering a sludge trap to the well, flushing the wellbore and transporting cuttings to the surface in the form of two coaxially located coiled tubing pipes, on the shoe of which a sludge trap is fixed. The cavity of the inner pipe is connected to the hydraulic pump. The sludge trap consists of a stationary cylindrical body with a movable module installed in its cavity with the possibility of rotation in the form of two rigidly connected coaxial pipes, in the cavities of which screw blades are fixed, forming screw conveyors. In the nose area of ​​the outer and inner tubes of the mobile module, nozzles are placed, the inlet nozzles of which communicate with the cavity of the inner tube, and the outlet nozzles with the cavity of the outer tube with their orientation in the direction of the wellhead. Coaxial tubes of the mobile module and coaxially positioned coiled tubing pipes have equal diameters. The end of the inner pipe of the sludge collection module, facing the bottom, is made damped and rotatably mounted on a support. The end of the outer pipe is open. The free end ends of the cylindrical body facing the bottom are made with sharp edges.

EFFECT: ensured the stages of destruction of sediments, flushing the well and carrying cuttings to the surface without creating repression on the formation, preventing clogging of the near-wellbore zone in conditions of abnormally low formation pressure is provided in a single continuous closed cycle in one round-trip operation.

1 cl, 2 dwg

Similar patents RU2757385C1

Title Year Author Number
RECOVERING METHOD OF WORKING CONDITION OF GAS-OIL PRODUCTION WELL WITH HORIZONTAL AND/OR SUBHORIZONTAL END DURING OPERATION, AND TECHNOLOGICAL COMPLEX FOR METHOD'S IMPLEMENTATION 2011
  • Gapetchenko Viktor Ivanovich
  • Pul'Nikov Igor' Borisovich
RU2482268C1
METHOD FOR CONSTRUCTION OF MULTI-HOLE WELL IN UNSTABLE RESERVOIRS 2024
  • Fursin Sergei Georgievich
  • Gneush Vladislav Sergeevich
  • Al-Idrisi Mokhammed Salekh Abdullakh Khaled
RU2825795C1
METHOD FOR COMPLETING A WELL IN DIFFICULT CONDITIONS 2023
  • Fursin Sergei Georgievich
  • Al-Idrisi Mokhammed Salekh
RU2806388C1
DEPRESSION-REPRESSION ASSEMBLY FOR WELL COMPLETION AND REPAIR IN DIFFICULT CONDITIONS 2019
  • Fursin Sergej Georgievich
RU2703553C1
METHOD FOR KILLING HORIZONTAL GAS WELLS 2023
  • Minaev Yakov Denisovich
  • Dvojnikov Mikhail Vladimirovich
RU2813414C1
DEPRESSION-REPRESSION DRILLING ASSEMBLY FOR COMPLETION AND REPAIR OF WELL 2019
  • Fursin Sergej Georgievich
RU2702438C1
METHOD FOR INVESTIGATION OF HORIZONTAL WELLS 2016
  • Gutorov Yulij Andreevich
  • Gilmanova Alfiya Magdanurovna
RU2642694C1
DEPRESSION-REPRESSION ASSEMBLY FOR WELL COMPLETION AND REPAIR 2019
  • Fursin Sergej Georgievich
  • Antoniadi Dmitrij Georgievich
RU2701758C1
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH HYDRAULIC MONITOR AT PRESSURE DRAWDOWN 2016
  • Popov Pavel Ivanovich
RU2632836C1
ACID TREATMENT OF AN OIL EXPLOITATION WELL BOTTOM-HOLE AREA 2011
  • Khisamov Rais Salikhovich
  • Shafigullin Rinat Il'Dusovich
  • Chupikova Izida Zangirovna
  • Afljatunov Rinat Rakipovich
  • Kamaliev Damir Sagdievich
  • Sekretarev Vladimir Jur'Evich
  • Afletonova Natal'Ja Viktorovna
RU2441979C1

RU 2 757 385 C1

Authors

Ipatov Andrej Ivanovich

Kremenetskij Mikhail Izrailevich

Lazutkin Dmitrij Mikhajlovich

Dates

2021-10-14Published

2021-04-09Filed