FIELD: oil industry.
SUBSTANCE: invention relates to oil production and can be used to predict the spatial orientation of hydraulic fracturing cracks at the planning stage of the event. In the method for predicting the spatial orientation of a hydraulic fracturing crack, immediately before hydraulic fracturing is carried out at the hydraulic fracturing well and in the drainage zone of each of the wells of the development system element, reservoir pressure is determined, a map of the distribution of reservoir pressure is built within the development system element in which the hydraulic fracturing well is located, with the help of which, before hydraulic fracturing, the maximum reservoir pressures for the drainage zones of the wells of the development element are determined and in the direction of these wells, the priority direction for the development of hydraulic fracturing cracks is established.
EFFECT: increase in the efficiency of hydraulic fracturing planning and determination of the spatial orientation of hydraulic fracturing cracks without involving expensive microseismic and geophysical studies.
1 cl, 3 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING DIMENSIONS AND SPATIAL LOCATION OF HYDRAULIC FRACTURING BASED ON GEOLOGICAL AND FIELD DATA | 2021 |
|
RU2769492C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT WITH HORIZONTAL WELLS WITH MULTI-STAGE FRACING | 2018 |
|
RU2672292C1 |
METHOD OF GAS DEPOSIT DEVELOPMENT IN LOW PERMEABLE SILICEOUS OPOKAMORPHIC RESERVOIRS | 2020 |
|
RU2745640C1 |
METHOD FOR DETERMINING SPATIAL ORIENTATION OF FRACTURE OF HYDRAULIC FRACTURING IN HORIZONTAL WELLBORE | 2017 |
|
RU2667248C1 |
METHOD OF ANALYSING HORIZONTAL WELLS WITH MULTISTAGE HYDRAULIC FRACTURING IN LOW-PERMEABILITY HEADERS | 2019 |
|
RU2734202C1 |
METHOD OF DIRECTED HYDRAULIC FRACTURING OF COAL BED | 2019 |
|
RU2730688C1 |
METHOD FOR DETERMINING THREE-DIMENSIONAL ORIENTATION OF HYDRAULIC FRACTURES | 2016 |
|
RU2626502C1 |
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC CONNECTION OF WELL WITH PRODUCTIVE FORMATION | 2011 |
|
RU2462590C1 |
METHOD OF CONTROL OVER HYDRAULIC FRACTURING PATH IN FORMATIONS WITH INTRINSIC FRACTURES | 2009 |
|
RU2505670C1 |
Authors
Dates
2022-05-11—Published
2021-06-21—Filed