METHOD FOR CEMENTING THE CASING STRING OF A BOREHOLE Russian patent published in 2022 - IPC E21B33/14 

Abstract RU 2778361 C1

FIELD: petroleum industry.

SUBSTANCE: invention relates to the field of drilling petroleum and gas boreholes and can be used in cementing casing strings in the steady-state mode. Casing strings are cemented with a shut-in wellhead in the steady-state mode. Before tempering the cement, the annular preventer (PUG) is closed, the hydraulic valve in the working flow line is opened, a cementing unit is connected to the valve block in order to control the volume of the solution exiting the borehole. The back pressure required to ensure the steady-state mode is created in the behind-the-casing space at the wellhead by means of a throttle valve. The back pressure value depending on the position of the lower boundary of the cement solution in the borehole is determined by calculation, with account for the depth of descent of the casing string and the distance from the wellhead to the moving lower interface between the cement solution and the drilling mud in the casing string, respectively, the height of the cement solution column in the casing string at the end of pumping, corresponding to the volume required to cement the casing string; for the injection pressure and back pressure at the wellhead, respectively; the densities of the cement solution and the drilling mud, respectively; the coefficients of hydraulic resistances in the movement of the cement solution and the drilling mud in the casing string and the drilling mud and the cement solution in the annular behind-the-casing space; the speed of the cement solution or drilling mud in the casing string; the diameters of the borehole, the outer and inner casing string.

EFFECT: increase in the quality of cementing and increase in the effectiveness thereof due to the reduction in the borehole construction cost caused by preventing the occurrence of complications and the cost of elimination thereof.

1 cl, 2 dwg

Similar patents RU2778361C1

Title Year Author Number
METHOD OF CEMENTING WELLS 0
  • Kotelnikov Vladimir Sevastyanovich
  • Marchuk Ivan Stepanovich
SU1189998A1
METHOD FOR REVERSE CASING CEMENTING 0
  • Petrov Nikolaj Aleksandrovich
  • Ovchinnikov Vasilij Pavlovich
SU1749445A1
METHOD FOR CEMENTING A FIBERGLASS CASING STRING (OPTIONS) 2022
  • Zaripov Ildar Mukhamatullovich
  • Akhmadishin Farit Foatovich
  • Iskhakov Albert Ravilevich
RU2777252C1
METHOD OF WELLS CEMENTING 2006
  • Lukmanov Rauf Rakhimovich
  • Lukmanova Rima Zaripovna
  • Bakirov Danijar Ljabipovich
  • Podkujko Petr Petrovich
RU2330935C2
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE 2000
  • Nersesov S.V.
  • Mosienko V.G.
  • Gasumov Ramiz Alidzhavad Ogly
  • Klimanov A.V.
  • Ostapov O.S.
  • Minlikaev V.Z.
  • Chernukhin V.I.
RU2188302C2
WELL CASING METHOD IN COMPLICATED CONDITIONS AND DEVICE FOR ITS IMPLEMENTATION 2022
  • Fursin Sergei Georgievich
  • Al-Idrisi Mokhammed Salekh Abdullakh Khaled
RU2781458C1
METHOD FOR CEMENTING OF LINER 0
  • Petrov Nikolaj Aleksandrovich
  • Levinson Lev Mikhajlovich
SU1624126A1
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL 2000
  • Tagirov K.M.
  • Dubenko V.E.
  • Andrianov N.I.
  • Zinov'Ev V.V.
RU2183724C2
METHOD FOR STEP-BY-STEP WELL GROUTING 1991
  • Eremenko V.V.
  • Kogan Eh.V.
  • Vdovenko A.I.
  • Abramov A.A.
  • Dudko M.P.
RU2038462C1
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS 2006
  • Gasumov Ramiz Alidzhavad Ogly
  • Mosienko Vladimir Grigor'Evich
  • Shvets Ljubov' Viktorovna
  • Nersesov Sergej Vladimirovich
  • Gromadskij Sergej Anatol'Evich
  • Kashapov Marat Aljamovich
  • Ponomarenko Mikhail Nikolaevich
  • Petjalin Vladimir Evgen'Evich
RU2342517C2

RU 2 778 361 C1

Authors

Likhushin Aleksandr Mikhajlovich

Kovalevskaya Olga Aleksandrovna

Dates

2022-08-17Published

2021-06-21Filed