FIELD: construction.
SUBSTANCE: method for operation of several cranes is proposed. In threatening collision between first crane (1) being operated and second crane (2) not being operated, first crane (1) is stopped, connection (21) for remote control is created from first crane (1) to second crane (2). Second crane (2), using control commands, which are generated on first stopped crane (1) and, through connection (21) for remote control, are transmitted to second crane (2), is brought out of a collision area, which hinders planned movement of first crane (1). Second crane (2), after remotely controlled bringing out of the collision area, is stopped, and first crane (1) is actuated again and moved. A method for operation of several cranes and cranes are also proposed.
EFFECT: prevention of crane collision is achieved with simultaneous elimination of undesired obstacles for working tasks, without the need for complex additional equipment of crane control.
16 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
REMOTE CONTROL DEVICE FOR CRANE, CONSTRUCTION MACHINE AND/OR LIFT TRUCK | 2017 |
|
RU2741456C2 |
REMOTE CONTROL DEVICE FOR CRANE, CONSTRUCTION MACHINE AND/OR LIFT TRUCK | 2017 |
|
RU2719048C1 |
CRANE | 2018 |
|
RU2683918C1 |
SYSTEM FOR CENTRAL CONTROL OF ONE OR MORE VALVES | 2016 |
|
RU2731939C2 |
ROTARY TOWER CRANE | 2013 |
|
RU2623287C2 |
CRANE SIMULATOR, CONSTRUCTION MACHINE OR FORKLIFT TRUCK | 2017 |
|
RU2730697C2 |
METHOD AND DEVICE FOR CARGO LIFTING | 2018 |
|
RU2768693C2 |
METHOD OF CHECKING POSITION OF RAIL CRANE ON CRANE TRACK | 2005 |
|
RU2281241C2 |
CRANE AND CONTROL METHOD OF SUCH CRANE | 2017 |
|
RU2728315C2 |
CRANE | 2023 |
|
RU2812497C1 |
Authors
Dates
2022-09-28—Published
2019-01-04—Filed