FIELD: oil industry.
SUBSTANCE: invention relates to the oil industry and can be used in the operation of an oil well. A method for operating a production well is claimed, including lowering and tight landing in the production string above the productive formation of a packer with a branch pipe with a guide cone, lowering into the well on the rods of a sucker rod pump - SRP with a lock on the cylinder until tight interaction with the locking support, selection of formation products, stopping SRP and injection of working agent and/or reagents into the reservoir. In this case, before running the packer, the packer is equipped with a continuous longitudinal channel that remains open after the packer is installed in the production string and is equipped with a spring-loaded valve that can be kept closed while holding the liquid column above the packer. Moreover, when the working agent and/or reagents are injected into the reservoir, excess pressure is created in the production string to open the spring-loaded valve and flow the working agent and/or reagents from the above-packer space of the production string into the under-packer space and further into the reservoir.
EFFECT: creation of a method for operating a production well, which allows injection of a working agent and/or reagents immediately after the SRP is stopped along the casing string due to the presence of a through channel in the packer, which, as a result, saves a large amount of working time.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
OPERATING METHOD OF PRODUCTION WELL | 2019 |
|
RU2713287C1 |
REPAIR METHOD OF PRODUCTION CASING OF PRODUCING WELL | 2020 |
|
RU2730158C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS WITH LARGE DEPTHS OF PRODUCTIVE HORIZONS AND LOW WELL YIELDS | 2019 |
|
RU2713547C1 |
METHOD FOR SEALING A PRODUCTION STRING | 2017 |
|
RU2670816C9 |
METHOD FOR SEALING DEFECT IN WORKING COLUMN OF PRODUCTION WELL (OPTIONS) | 2020 |
|
RU2750016C1 |
PROCEDURE FOR REPAIR OF ANNULUS SPACE OF STRING BOREHOLE WITH TWO EXPOSED FORMATIONS | 2009 |
|
RU2397314C1 |
PROCEDURE FOR REPAIR OF ANNULUS SPACE OF STRING BOREHOLE WITH TWO EXPOSED FORMATIONS | 2009 |
|
RU2397313C1 |
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS | 2009 |
|
RU2405925C1 |
SUBMERSIBLE PUMP WITH BYPASS FOR LIQUID INJECTION | 2021 |
|
RU2761798C1 |
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP | 2015 |
|
RU2589016C1 |
Authors
Dates
2022-11-14—Published
2022-05-17—Filed