FIELD: oil and gas industry.
SUBSTANCE: invention relates to the oil and gas industry, and in particular to devices for lifting to the day surface of products from wells with the possibility of pumping liquid into the sub-packer space in downhole conditions. A submersible pump with a bypass channel for liquid injection comprises a submersible borehole pump lowered on a pipe string, equipped with a liner at the bottom and a bypass channel communicated with the liner and the inner space of the pipe string above the pump. The bypass channel is equipped with a spring-loaded adjustable valve that closes the fluid flow in the bypass channel between the liner and the internal space of the pipe and maintains the pressure in the pipe string arising from the pump operation. The liner is equipped with a packer externally positioned above the reservoir. An overflow channel is made inside the liner, which communicates above the packer and subpacker spaces of the well and is equipped with a bypass spring-loaded valve that opens only at excessive pressure in the subpacker space during fluid injection through the bypass channel.
EFFECT: providing the ability to pump fluid into the formation through the pipe string without removing the pump and flushing the bottomhole zone.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS | 2009 |
|
RU2405925C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR | 2024 |
|
RU2825381C1 |
APPARATUS FOR PUMPING LIQUID FROM TOP INTO LOWER WELL FORMATIONS (VERSIONS) | 2015 |
|
RU2591065C2 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
PUMP UNIT FOR PRODUCTS LIFT ALONG THE CASING STRING | 2015 |
|
RU2614426C1 |
PRODUCTION WELL OPERATION METHOD | 2022 |
|
RU2783453C1 |
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION | 2008 |
|
RU2381352C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
PRODUCTION METHOD OF OIL WITH HIGH GAS FACTOR | 2020 |
|
RU2737805C1 |
Authors
Dates
2021-12-13—Published
2021-06-10—Filed