SUBMERSIBLE PUMP WITH BYPASS FOR LIQUID INJECTION Russian patent published in 2021 - IPC E21B34/06 E21B43/00 F04B47/00 

Abstract RU 2761798 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to the oil and gas industry, and in particular to devices for lifting to the day surface of products from wells with the possibility of pumping liquid into the sub-packer space in downhole conditions. A submersible pump with a bypass channel for liquid injection comprises a submersible borehole pump lowered on a pipe string, equipped with a liner at the bottom and a bypass channel communicated with the liner and the inner space of the pipe string above the pump. The bypass channel is equipped with a spring-loaded adjustable valve that closes the fluid flow in the bypass channel between the liner and the internal space of the pipe and maintains the pressure in the pipe string arising from the pump operation. The liner is equipped with a packer externally positioned above the reservoir. An overflow channel is made inside the liner, which communicates above the packer and subpacker spaces of the well and is equipped with a bypass spring-loaded valve that opens only at excessive pressure in the subpacker space during fluid injection through the bypass channel.

EFFECT: providing the ability to pump fluid into the formation through the pipe string without removing the pump and flushing the bottomhole zone.

1 cl, 1 dwg

Similar patents RU2761798C1

Title Year Author Number
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS 2009
  • Parijchuk Nikolaj Ivanovich
  • Nagumanov Marat Mirsatovich
  • Aminev Marat Khusnullovich
RU2405925C1
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR 2024
  • Akhmetshin Ruslan Alfredovich
RU2825381C1
APPARATUS FOR PUMPING LIQUID FROM TOP INTO LOWER WELL FORMATIONS (VERSIONS) 2015
  • Nikolaev Oleg Sergeevich
RU2591065C2
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
PUMP UNIT FOR PRODUCTS LIFT ALONG THE CASING STRING 2015
  • Garifov Kamil Mansurovich
  • Ismagilov Fanzat Zavdatovich
  • Artyukhov Aleksandr Vladimirovich
  • Babichev Igor Nikolaevich
  • Lyubetskij Sergej Vladimirovich
  • Kadyrov Albert Khamzeevich
  • Glukhoded Aleksandr Vladimirovich
RU2614426C1
PRODUCTION WELL OPERATION METHOD 2022
  • Pokazanev Konstantin Vladimirovich
  • Gafiullin Ilnur Rasolevich
RU2783453C1
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2381352C1
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION 2022
  • Kuzyaev Salavat Anatolevich
RU2782227C1
PRODUCTION METHOD OF OIL WITH HIGH GAS FACTOR 2020
  • Ershov Andrei Aleksandrovich
  • Valeev Ilnur Ilsurovich
  • Mursalimov Aidar Galimianovich
RU2737805C1

RU 2 761 798 C1

Authors

Karimov Aidar Albertovich

Rizatdinov Rinat Faritovich

Dates

2021-12-13Published

2021-06-10Filed