FIELD: construction.
SUBSTANCE: invention relates to the field of construction, including transport, road and hydraulic engineering, and can be used to strengthen earthworks for various purposes, in particular earthen embankments, dams, slopes of earthworks intended for the construction of various structures on them, etc. objects erected on weak, including swampy soils. The device for strengthening earthworks contains a platform with equipment for the production of works, provided with longitudinal elements from below, which are made with the possibility of moving along the roller bearings mounted on the crossbars, and adapter devices for mounting on the heads of the support pipes are movably connected to the crossbars, while the production equipment works include equipment located on opposite sides of the platform for the manufacture and/or installation of piles and a winch. Equipment for the manufacture and/or installation of piles is placed on carriages with the ability to move along the platform along transverse guides.
EFFECT: ensuring the preservation of all the possibilities of installing piles in a sequential row, and also allows, if necessary, to install additional parallel rows of piles and/or separate piles outside the rows of anti-deformation structures, which are caused by bypassing existing obstacles, and the transverse movement of the carriage with drilling equipment placed on it allows you to significantly expand the area of work for the manufacture and/or installation of piles in one longitudinal passage of the platform, that is, the creation of several parallel rows.
6 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR EXECUTION OF CONSTRUCTION WORKS | 2017 |
|
RU2662471C1 |
SUPPORT MEANS FOR SUPPORT PIPE | 2017 |
|
RU2663423C1 |
PILE MANUFACTURING METHOD | 2017 |
|
RU2662469C1 |
METHOD AND DEVICE FOR CONSOLIDATION OF EARTH SLOPE | 1996 |
|
RU2107128C1 |
EARTHWORKS STRENGTHENING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2609505C1 |
METHOD OF PRODUCING PILES FOR STRENGTHENING EARTHWORKS | 2017 |
|
RU2657879C1 |
METHOD AND DEVICE FOR STABILIZATION OF EARTH STRUCTURE | 1997 |
|
RU2114957C1 |
COMPLEX FOR CONSTRUCTION OF MOTOR ROAD ON PILES | 2010 |
|
RU2453650C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD OF INSTALLING MOUNTED EQUIPMENT OF BERKUT DRILL-PILE DRIVER | 2001 |
|
RU2196203C1 |
Authors
Dates
2022-11-18—Published
2022-05-19—Filed