FIELD: construction.
SUBSTANCE: complex for construction of motor roads comprises a movable structure with installed process equipment for erection and installation of road base supports and installation of support-to-support elements with the capability of displacement along them. The supports of the road base are boring-movable anchor-piles. The movable structure comprises one or more self-propelled platforms with the required process equipment and finished units and structures of the road, from which all production cycles of the motor road erection are carried out: from drilling of wells and installation of boring-movable piles in them to laying of a road base in the form of a reinforced concrete boards, including installation of travel beams with rails, along which the structure itself moves.
EFFECT: complex to erect a piled motor road makes it possible to solve a task of complete mechanisation of all operations and cycles of the motor road erection on boring-movable piles.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CREATE AND SERVICE SPORT LAWN AND SPORT LAWN | 2010 |
|
RU2475584C2 |
METHOD FOR MOTOR ROAD CONSTRUCTION | 2015 |
|
RU2626107C2 |
AUTOMOBILE ROAD | 2014 |
|
RU2589138C2 |
METHOD FOR ERECTION OF BRIDGE ON WATER AREA | 2011 |
|
RU2483153C2 |
RAILWAY RAIL TRACK | 2017 |
|
RU2700098C2 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
TRANSPORT COMPLEX OF MEGALOPOLIS AND METHOD FOR CONTROL AND RELIEF OF PASSENGER, FREIGHT - PASSENGER AND FREIGHT TRAFFICS OF MEGALOPOLIS TRANSPORT COMPLEX | 1998 |
|
RU2140480C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
MEGAPOLICE RING HIGHWAY AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136802C1 |
EARTHWORKS STRENGTHENING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2609505C1 |
Authors
Dates
2012-06-20—Published
2010-10-19—Filed