FIELD: space technology.
SUBSTANCE: invention relates to space technology, in particular to the cable tension units. The guy tension unit contains a platform with guys fixed between the plate and the first bracket, as well as the second and third brackets for installation on the inner and outer sides of the hull load-bearing structure. The first bracket is connected to the third bracket by means of a tension adjustment mechanism. The regulator consists of two axes, a hinge, a rod, a stud, a washer and a nut. The third bracket has a technological window for assembly operations and repair work. The axle on the first bracket is a screw with a cool part.
EFFECT: lining on the platform with the guys has stiffening ribs and threaded holes.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CABLE TENSION ASSEMBLY | 2019 |
|
RU2712709C1 |
SLINGS TENSION ADJUSTMENT ASSEMBLY | 2018 |
|
RU2691552C1 |
METHOD FOR ASSEMBLING XENON HIGH PRESSURE TANK WITH CABLE FASTENING SYSTEM | 2022 |
|
RU2793771C1 |
ADJUSTABLE CONSTUCTION ATTACHING LUG WITH INTERFACE ON SLINGS | 2015 |
|
RU2625211C2 |
UNIVERSAL MOUNTING INTERFACE FOR INTERROJUSTATION OF EQUIPMENT WITH CABLE FASTENING SYSTEM | 2018 |
|
RU2689892C1 |
ADJUSTABLE SECURING ASSEMBLY | 2013 |
|
RU2559370C2 |
ADJUSTMENT CONNECTING DEVICE | 2014 |
|
RU2605666C2 |
ADJUSTABLE CLAMPING UNIT | 2016 |
|
RU2646041C2 |
LIQUID-PROPELLANT FOUR-CHAMBER ROCKET ENGINE FRAME | 2013 |
|
RU2527006C1 |
ASSEMBLY FOR DOCKING OF SPACECRAFT LOAD CARRYING STRUCTURE (VERSIONS) | 2019 |
|
RU2729909C1 |
Authors
Dates
2023-02-14—Published
2022-10-24—Filed