FIELD: oil production.
SUBSTANCE: method includes determining the density of perforations for the injection well, perforating the injection well, pumping a working agent through the injection well, and withdrawing oil through the production well. Preliminarily, geophysical studies of the reservoir of the development object are carried out, coefficients of open porosity Kp, oil saturation Ks and thickness hi of oil-saturated reservoir interlayers are determined Oil-saturated reservoir interlayers are combined into layers with a step of 0.05 fractions of units by coefficient of open porosity, starting from oil-saturated interlayer with a minimum coefficient of porosity Kp1. The summed power of all oil-saturated interlayers in the layer (Nlayer) is determined; then the weighted average coefficient of porosity Kp.weighted average and weighted average coefficient of oil saturation Ks.weighted average are determined for each selected layer. Next, the layer coefficient Klayer is determined for each selected layer according to the formula Klayer=Kpweighted average*Ks.weighted average, fractions of units. Next, determine the reservoir coefficient weighted average Kres.weighted average. Define the perforation hole density for each selected layer for the injection well Nres.inj and for reacting producing wells Nres.prod. using the formula Nres.inj.=10*Klayer/Kres.weighted average, holes/m, Nres.prod=10*Kres.weigted average/Klayer, holes/m, where Klayer is coefficient of the selected layer, Kres.weighted average is weighted average reservoir coefficient. Perforate the injection and reacting production wells.
EFFECT: increased efficiency of operation of a heterogeneous reservoir of an oil field development facility by increasing the coverage of the reservoir by the impact, the uniformity of oil reserve, maintaining high extraction rates of recoverable reserves, increasing the oil displacement ratio by providing integrated regulation of the injection of a displacing agent into the influencing injection well and the selection of fluid in reacting production well by perforating an oil-saturated reservoir with a calculated channel density.
1 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING MULTI-LAYER OIL DEPOSIT WITH HORIZONTAL WELL | 2023 |
|
RU2810359C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT BY HORIZONTAL WELL | 2023 |
|
RU2818333C1 |
METHOD FOR DEVELOPING OIL-WATER ZONE OF OIL FIELD | 2023 |
|
RU2804051C1 |
OIL FIELD DEVELOPMENT METHOD | 2022 |
|
RU2779704C1 |
METHOD FOR DETERMINATION OF CURRENT OIL SATURATION OF DEVELOPED RESERVOIR IN WORKING INTERVALS OF WELL WITH SUBSEQUENT RECOVERY OF FIELD OF CURRENT OIL SATURATION | 2020 |
|
RU2737453C1 |
METHOD FOR OIL PRODUCTION AT THE LATER STAGE OF OIL DEPOSIT HAVING WATER BED DEVELOPMENT | 2005 |
|
RU2299977C2 |
METHOD FOR AFTER-EXPLOITATION OIL DEPOSIT | 1994 |
|
RU2072033C1 |
METHOD OF LOW-PERMEABLE OIL DEPOSIT DEVELOPMENT | 2013 |
|
RU2526937C1 |
METHOD FOR DEVELOPMENT OF MULTI-BED OIL DEPOSITS | 1996 |
|
RU2113590C1 |
METHOD FOR EXTRACTING HIGHLY WATERED OIL POOL | 2005 |
|
RU2289020C1 |
Authors
Dates
2023-03-22—Published
2023-01-24—Filed