FIELD: oil-and-gas production.
SUBSTANCE: method includes pumping equipment withdrawal from the well, descending a tubing string into to the well, pumping water shut off solution with harden properties inside them, and the following the water shut off solution washing away. The tubing string equipped with a hydro monitoring nozzle and a plug seat with holes, connecting the tubing string inside space and a borehole, at that pump through the holes highly viscous water-repellent water non-soluble solution in to insulating interval, the a cement slurry based on I-G cement type with water - cement ratio 0.44, install a plug with a deformable membrane closing end-to end inside channel, the pump in an overflush fluid till the plug settled in the seat, lift pipes to safe area. After the cement slurry hardening up to 100 Vs descend an assembly, increase pressure in TS by pumping in overflush fluid until the membrane failed and wash cement away from borehole by pumping washing liquid with cement hardening retarding mixture through the tubing string via hydro monitoring nozzle.
EFFECT: water shut off screen sealing properties increase.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS | 2014 |
|
RU2578095C1 |
RESERVOIR SELECTIVE SEALING METHOD AT WELL CASING STRING FIRST STAGE CEMENTING | 2008 |
|
RU2379475C1 |
METHOD OF RESTRICTING WATER PRODUCTION INTO OIL PRODUCING WELL | 2008 |
|
RU2370629C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
INSTALLATION METHOD OF EASILY BREAKABLE CEMENT PLUG IN HORIZONTAL WELL | 2014 |
|
RU2565618C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL UNDER INTAKE FORMATION | 2012 |
|
RU2503795C1 |
METHOD FOR HORIZONTAL WELL OPERATION | 2011 |
|
RU2447265C1 |
METHOD OF BOTTOM WATER CONE CUTTING | 2016 |
|
RU2655490C2 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
Authors
Dates
2010-01-20—Published
2008-09-02—Filed