FIELD: oil and gas industry.
SUBSTANCE: invention relates to well construction and final logging before running the casing. A method of well completion, including a casing string rundown and well cementing, characterized in that the following arrangement is first installed on the casing string from bottom to top: a through-hole drilling shoe with a central flushing hole with a diameter equal to the inner diameter of the casing string and at a distance of at least 1 m from it a stop ring with an inner diameter exceeding the diameter of the run-down geophysical tool, the casing string is run with the hook-up into the well to a depth that allows blocking the cavernous sections of the wellbore, then a geophysical tool is run into the casing string on a cable until the bottomhole of the well is reached, geophysical surveys are carried out and a geophysical tool is retrieved to the surface, after that the casing string is run into the well to the design depth and the well is cemented.
EFFECT: geophysical surveys with unhindered descent of geophysical instruments on a cable to the bottomhole without preliminary preparation of the wellbore complicated by cavernous sections, as well as reducing the time spent at the well completion stage.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL COMPLETION METHOD | 2018 |
|
RU2723815C1 |
METHOD FOR CONSTRUCTION OF WELLS ON THE TERRIGENOUS DEVONIAN DEPOSITS OF THE ROMASHKINO OIL FIELD | 2020 |
|
RU2745493C1 |
METHOD OF DRILLING HORIZONTAL WELLS WITH PILOT SHAFT | 2015 |
|
RU2587660C1 |
TAIL PIPE FOR SIDE HOLE ATTACHMENT | 2013 |
|
RU2539489C2 |
METHOD FOR DRILLING OF LATERAL TRUNK WITH UNSTABLE ROCKS | 2022 |
|
RU2785164C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541981C1 |
FLOW DIVERTER | 2024 |
|
RU2825377C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541980C1 |
WORKING BOTTOM | 2021 |
|
RU2757839C1 |
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
Authors
Dates
2023-04-25—Published
2022-10-20—Filed