METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS Russian patent published in 2023 - IPC E21B43/24 E21B7/06 E21B47/04 

Abstract RU 2803347 C1

FIELD: oil industry.

SUBSTANCE: development of deposits of high-viscosity oil or bitumen with an oil-saturated thickness of less than 10 m. In the method for developing a deposit of extra-viscous oil 1, including drilling a vertical well 2, studying the porosity and permeability properties of the formations exposed by drilling, separating bitumen-saturated and water-saturated interlayers, after separating water-saturated and oil-saturated interlayers, the level of water-oil contact of WOC 3 is determined. After that, a pipe string 4 is lowered into a vertical well 2 to a depth of 10 m below the WOC 3 and cemented to form an artificial bottom hole. Next, a lower whipstock is installed in the direction of lower drilling sidetracks 5, 5', a window is cut out. Drilling is carried out from 2 to 4 lower side horizontal tracks 5, 5' 50-100 m long, and in such a way that the lower points of the lower side horizontal tracks 5, 5' are located at a distance of at least 2 m from the WOC 3, and the bottoms of the lower side horizontal tracks 5, 5' were 2 m above the lower points of the lower side horizontal tracks 5, 5'. Then, 5-7 m above the lower whipstock, the upper whipstock is installed in the direction of drilling of the upper sidetracks 6, 6', a window is cut out. Drilling is carried out from 2 to 4 upper side horizontal tracks 6, 6' with a length of 50-100 m parallel to WOC 3 and in such a way that the lower points of the upper side horizontal tracks 6, 6' are located at a distance of 5-7 m from the lower points of the lower side horizontal tracks 5, 5', and the bottoms of the upper side horizontal tracks 6, 6' and the lower side horizontal tracks 5, 5' were at a distance of 3-5 m from each other. A sealing unit 8 is installed at the lower end of the pipe string 7, then a filter string 9 3 m long and a packer 10 are installed. A pipe string 7 is lowered into the vertical well 2 to artificial bottom hole with the location of the filter string 9 opposite the interval of kicking off the lower side horizontal tracks 5, 5', and the packer 10 is between the intervals of kicking off the lower side horizontal tracks 5, 5' and the upper side horizontal tracks 6, 6'. After that, steam is injected into the vertical well 2 between the pipe strings 4 and 7 at an intensity of up to 30 tons/day for 50 days, the steam injection is stopped for thermocapillary impregnation for 20 days. Then, the pump 10 is lowered into the pipe string 7, complete with the filter column 8, to a depth of 3 m above the artificial bottom hole, and the liquid is withdrawn, the steam injection is continued.

EFFECT: increase in the coverage of the deposit development, an increase in the oil recovery of the formation.

1 cl, 1 dwg, 3 ex

Similar patents RU2803347C1

Title Year Author Number
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS 2023
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2803344C1
SUPERVISCOUS OIL DEPOSIT DEVELOPMENT METHOD 2024
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Khamadeev Damir Gumerovich
  • Garifullin Marat Zufarovich
RU2826128C1
METHOD FOR DEVELOPMENT OF LAYER-BY-LAYER-ZONAL-HETEROGENEOUS DEPOSITS OF SUPER-VISCOUS OIL OR BITUMEN 2021
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Kurinov Andrei Ivanovich
  • Garifullin Marat Zufarovich
RU2761799C1
METHOD FOR DEVELOPMENT OF LAYER-BY-LAYER-ZONAL NON-UNIFORMV DEPOSIT OF SUPERVISCOUS OIL OR BITUMEN 2024
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Akhmetzianov Fanil Muktasimovich
  • Garifullin Marat Zufarovich
RU2822258C1
METHOD FOR DEVELOPING SUPER-VISCOUS OIL DEPOSITS AT A LATE STAGE 2023
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2808285C1
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING 2012
  • Khisamov Rais Salikhovich
  • Ibatullin Ravil' Rustamovich
  • Idijatullina Zarina Salavatovna
  • Sajfutdinov Marat Akhmetzievich
  • Fedorov Aleksandr Vladislavovich
RU2504646C1
SUPERHIGH VISCOSITY OIL WITH AQUIFERS DEPOSIT DEVELOPMENT METHOD 2018
  • Amerkhanov Marat Inkilapovich
  • Aslyamov Niyaz Anisovich
  • Garifullin Marat Zufarovich
RU2680089C1
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS 2008
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
  • Asadullin Marat Fagimovich
RU2363839C1
METHOD FOR INTENSIFYING BOREHOLE OPERATION BY DRILLING SIDE HOLES 2020
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2750805C1
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT AT LATE STAGE 2019
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Kurinov Andrei Ivanovich
  • Garifullin Marat Zufarovich
RU2719882C1

RU 2 803 347 C1

Authors

Amerkhanov Marat Inkilapovich

Asliamov Niiaz Anisovich

Garifullin Marat Zufarovich

Dates

2023-09-12Published

2023-04-20Filed