FIELD: oil and gas industry.
SUBSTANCE: method for intensifying oil production in a well includes geophysical studies of formations located one above the other in the projection of a previously drilled well, and modelling the process of determining the need for primary and/or secondary penetration of reservoirs by a well for further development and obtaining efficient and cost-effective oil growth using criteria. The criteria used are the residual amount of oil in the corresponding formations, their corresponding oil saturation, permeability, response to external pressure, reservoir pressure, and product properties - chemical and fractional composition. After modelling the process of determining the need for primary and/or secondary penetration of formations by a well, additional studies are carried out on productivity, permeability and, oil saturation of the selected formations from wells that penetrated at least one of these formations and are located in the same oil area. In this case, by superimposing the calculated and the actual results, the data are adjusted and their subsequent modelling is carried out, after which the well is deepened with primary opening and/or secondary penetration of the formations. Based on the analysis of the properties of the product and the reservoir pressure of the corresponding formation, either single-lift or simultaneous-separate exploitation of the formations is carried out. Single-lift operation of formations is carried out when the formation fluids and formation pressures are compatible, allowing for the lifting of formation products by a common filter with one downhole pumping equipment, otherwise - simultaneous separate operation.
EFFECT: improved efficiency of opening and developing additional formations in a previously constructed well.
1 cl, 5 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
WELL FLOW RATE INCREASING METHOD | 2008 |
|
RU2400623C2 |
METHOD FOR OPERATION OF OIL WELL WITH BOTTOM WATER | 2020 |
|
RU2730163C1 |
METHOD OF SURVEY AND ASSESSMENT OF RESERVES OF OIL DEPOSITS IN TIGHT FISSURED STRINGERS DEVELOPED IN OIL SOURCE STRATA | 2008 |
|
RU2363966C1 |
METHOD OF DEVELOPING MULTI-BED MASSIVE OIL DEPOSIT | 2011 |
|
RU2464414C1 |
METHOD FOR DEVELOPMENT OF HYDROCARBON POOLS OF COMPLICATED GEOLOGICAL STRUCTURE | 1992 |
|
RU2030567C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD FOR DEVELOPING DEPOSITS IN LAYERED RESERVOIRS | 2022 |
|
RU2787503C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485291C1 |
METHOD FOR MINING-WELL EXTRACTION SCAVENGER OIL AND PROCESS EQUIPMENT SYSTEM THEREFOR | 2015 |
|
RU2593614C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2578090C1 |
Authors
Dates
2023-10-09—Published
2023-03-10—Filed