FIELD: construction.
SUBSTANCE: invention can be used in the construction of structures with concrete floors. The method consists in the fact that in the crack formed in the concrete floors, the concrete floors are opened to the depth of the concrete covering, a cylindrical excavation of the soil is carried out in the middle and along the edges of the opened area, anchors are installed by immersing them in the cylindrical excavations with simultaneous vibration compaction of the soil. The anchors are connected to each other in the horizontal direction with the possibility of tension in the direction opposite to the tensile forces arising in the soil mass and concrete floors, the upper parts of the anchors are connected using geogrids and the exposed area of the floor is filled with concrete mixture.
EFFECT: increasing the reliability of protection of concrete floors from cracking and eliminating the possibility of their further deformation.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOATING CRAFT | 2021 |
|
RU2772760C1 |
METHOD TO PREVENT DEFORMATIONS OF LINEAR STRUCTURES ERECTED ON LANDSLIDE SLOPES OR MANMADE SLOPES ON MELTING PERMAFROST SOILS | 2014 |
|
RU2556646C1 |
METHOD FOR REDUCTION OF DEFORMATIONS OF MOTOR AND RAILWAY ROADS ON PERMAFROST SOILS THAT THAW OUT IN PROCESS OF OPERATION | 2013 |
|
RU2536538C1 |
PRE-STRESSED PROTECTIVE SHELL OF REACTOR COMPARTMENT OF NPP | 2015 |
|
RU2594501C1 |
E.N. KHRUSTALEV'S METHOD OF DETERMINING PRESSURE OF SURFACE AND INTERNAL CRACKING | 2015 |
|
RU2620127C2 |
ROAD PAVING CONSTRUCTION METHOD | 2006 |
|
RU2318947C2 |
REINFORCEMENT FOR CONCRETE ELEMENTS, SYSTEM AND METHOD FOR PRODUCTION OF REINFORCED CONCRETE ELEMENTS | 2006 |
|
RU2413059C2 |
METHOD FOR ERECTION OF CONCRETE BRIDGE PIER | 2000 |
|
RU2165491C1 |
METHOD TO REPAIR AND CONSTRUCT ARTERIAL HIGHWAYS | 2009 |
|
RU2422581C1 |
METHOD OF CONSTRUCTING GROUND ANCHOR AND GROUND ANCHOR ITSELF | 1997 |
|
RU2131495C1 |
Authors
Dates
2023-11-28—Published
2023-05-11—Filed