FIELD: construction.
SUBSTANCE: invention relates to technologies for dismantling and destruction of building structures during the liquidation of buildings. The method consists of drilling holes, breaking a block, and after drilling, through holes are made in the holes for slinging a reinforced concrete structure, through which slings are attached. Then slinging is carried out with the removal of slack in the sling branches, diamond cutting of the monolithic reinforced concrete structure into blocks, and moving the blocks to the breaking point. After breaking, the reinforcement bars removed with hydraulic shears, the resulting concrete scrap is crushed, the reinforcement bars are packaged and transported to the plant. The block is broken with randomly directed cracks using a jackhammer. Before diamond cutting, supporting beams are installed under the structure to be dismantled, and the block is slung after it is cut.
EFFECT: no uncontrolled displacement of the detachable part of the structure resting on pre-installed supporting devices.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DISMANTLING A MONOLITHIC REINFORCED CONCRETE STRUCTURE WITH THE DISPOSAL OF MATERIALS FROM DISMANTLING | 2022 |
|
RU2779800C1 |
METHOD FOR DISMANTLING MONOLITHIC REINFORCED CONCRETE BEAMLESS FLOOR WITH RECYCLING OF MATERIALS LEFT AFTER DISASSEMBLY | 2023 |
|
RU2811515C1 |
METHOD OF DISMANTLING REINFORCED CONCRETE SLAB OF STRUCTURE USING SCISSOR LIFT AND LOAD HANDLING ELEMENTS | 2024 |
|
RU2826960C1 |
METHOD FOR DESTRUCTION OF MONOLITHIC ARRAYS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2547526C2 |
STRUCTURE REINFORCED CONCRETE SLAB DISMANTLING METHOD AND LOAD-GRIPPING DEVICE WITH ECCENTRIC FOR ITS IMPLEMENTATION | 2017 |
|
RU2662478C1 |
METHOD FOR OIL PRODUCT RESERVOIR DEMOUNTING | 2005 |
|
RU2305166C1 |
REMOVAL METHOD OF GIRDER REINFORCED-CONCRETE SUPERSTRUCTURE OF BRIDGE USING CABLE-SUPPORTED SYSTEM | 2013 |
|
RU2534556C1 |
DEVICE FOR DISASSEMBLY OF EMERGENCY WALL PANELS | 2016 |
|
RU2639935C1 |
METHOD OF REPAIR AND RECONSTRUCTION OF TALL CHIMNEYS AND PARTIAL DISASSEMBLY OF SHAFT DURING THEIR RECONSTRUCTION | 2001 |
|
RU2209282C1 |
METHOD FOR FRAGMENTARY VERTICAL METAL RESERVOIR DEMOUNTING | 2006 |
|
RU2311285C1 |
Authors
Dates
2024-02-21—Published
2023-08-01—Filed