FIELD: pointwork structures.
SUBSTANCE: pointwork contains frame rails laid on a base and ramps interconnected by a rod with welded rail ends, having a forward direction and a side branch with a transfer curve of constant radius of curvature of the side track of 305 m. Moreover, the initial arrow angle is made equal to 0° 15' 31.31''f, and the calculated angle of impact on the ramp with a maximum gap between the wheel flange and the frame rail equal to 36 mm, when moving onto the side track is made equal to 0° 52' 49.17''.
EFFECT: reduction in the wear rate of the curved ramp is achieved.
4 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
SHARP-BEND SWITCH ,PARTICULARLY, FOR PROCESS TRACKS OF INDUSTRIAL PLANTS | 0 |
|
SU1204655A1 |
SWITCH | 0 |
|
SU1802021A1 |
SWITCH | 2002 |
|
RU2225907C2 |
SWITCH GEAR | 2017 |
|
RU2731520C2 |
METHOD FOR EARLY FRAGMENTARY INSTALLATION OF A SINGLE SWITCHOVER ON WOODEN SLEEPERS | 2021 |
|
RU2762047C1 |
DOUBLE-CROSSED SWITCH SHIFT | 0 |
|
SU1111776A1 |
TEETH RAILWAY SWITCH | 0 |
|
SU1729860A1 |
SWITCH | 0 |
|
SU1204654A1 |
DOUBLE CROSSING SWITCH POINT | 0 |
|
SU1393855A1 |
METHOD OF DIAGNOSTICS OF RAILWAY AND SYNCHRONIZATION OF MEASUREMENT RESULTS | 2018 |
|
RU2680927C1 |
Authors
Dates
2024-03-06—Published
2023-10-10—Filed