FIELD: construction.
SUBSTANCE: invention relates to the field of construction, namely to the field of construction of prefabricated houses, the walls of which are made from a half-beam located in two rows, with a warm angle. Method of erection of walls of prefabricated log house, made in the form of two parallel horizontal rows of external half-beam and internal half-beam with vertical angular posts at the ends, limited by upper strapping and lower strapping, wherein two parallel horizontal rows of outer half-beam and inner half-beam on inner side of outer and inner half-beam are connected by vertical intermediate post, is characterized by the fact that the lower strapping of the glued board is initially laid; installing corner posts from a solid tree trunk at the corners of the prefabricated log house; starting outer half-beam and inner half-beam are installed in two parallel horizontal rows; then intermediate posts of planed boards are installed between inner half-beam and outer half-beam; inside parallel horizontally arranged rows from the outer half-beam and the inner half-beam there is a heater, delimited by intermediate posts into separate parts, and protective vapour barrier and wind barrier films are installed; continuing to lay parallel horizontal rows of external half-beam and internal half-beam until the required height of the walls of the prefabricated log house is achieved; then, glued board top strapping is mounted; then, tie rods with threaded ends are inserted into pre-drilled vertical holes in outer half-beam and inner half-beam, which are located from upper binding to lower binding in the middle between intermediate posts of planed board.
EFFECT: increased time of heat preservation in prefabricated log house, as well as possibility of energy saving.
2 cl, 6 dwg
Authors
Dates
2025-02-03—Published
2024-07-23—Filed