FIELD: laying pipe lines in permafrost. SUBSTANCE: pipe line 3 is laid in trench 1 at depth determined from mathematical dependence given in Description. Pipe line 3 is laid on cushion made of soil whose coefficient of thermal conductivity is lesser than that of base of trench 1 and is filled-in with soil 4 identical to that of cushion which reduces operational costs due to reduction of heat losses in transportation of product through pipe line. EFFECT: reduction of operational expenses due to reduction of heat losses in transportation of products through pipe lines. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING MULTISTRAND PIPELINE SYSTEM | 0 |
|
SU1753157A1 |
PROCESS OF LAYING GAS PIPE-LINE IN PERMAFROST | 1987 |
|
SU1438344A1 |
METHOD FOR LAYING UNDERGROUND PIPELINES IN FROZEN GROUNDS | 0 |
|
SU1810705A1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
METHOD FOR DUMP FORMATION | 0 |
|
SU1749458A1 |
METHOD OF INSTALLING AGROUND IN PERMAFROST | 2004 |
|
RU2276825C2 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
METHOD OF CONSTRUCTING A CANAL | 0 |
|
SU1063914A1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
Authors
Dates
1995-10-10—Published
1989-10-27—Filed