FIELD: nuclear technology. SUBSTANCE: invention relates to preparation on injured clusters of fuel elements. Chamber includes crane, preparation pit, tipper, cover, drive of cover turning, cutting lathe, clamping device, manipulator with working element, case composed of lower and upper parts joined by fast-separation lock. EFFECT: increased productivity and safety. 15 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECOVERY OF PARTLY DESTROYED TWO-UNIT FUEL ASSEMBLY OF NUCLEAR REACTOR, ASSEMBLY CHAMBER AND FAKE HEAT ELEMENT FOR RECOVERY OF HEAT ASSEMBLY | 1992 |
|
RU2072569C1 |
METHOD AND CHAMBER FOR SEPARATING SPENT TWO- BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR ITS FURTHER DISPOSAL | 1999 |
|
RU2171508C2 |
METHOD AND PREPARATION CHAMBER FOR PREPARING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR STORAGE | 2002 |
|
RU2219605C2 |
METHOD AND FACILITY FOR STRIPPING SPENT FUEL ASSEMBLY OF NUCLEAR REACTOR | 2001 |
|
RU2208849C2 |
CHAMBER OF SEPARATION OF TWO-BEAM ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2031460C1 |
METHOD AND CHAMBER FOR DISMANTLING NUCLEAR REACTOR SPENT FUEL FOR ITS NEXT STORAGE | 2002 |
|
RU2226011C2 |
PROCESS OF SPENT FUEL ASSEMBLY LOADING INTO CAPSULE FOR FURTHER STORAGE, AND CAPSULE FOR IMPLEMENTING PROCESS | 2006 |
|
RU2328046C2 |
DEVICE FOR SEPARATING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2069902C1 |
UNIT FOR SPLITTING SPENT FUEL ASSEMBLIES | 2000 |
|
RU2185669C2 |
LENGTHY PARTS TILTER | 1992 |
|
RU2065628C1 |
Authors
Dates
1995-06-09—Published
1990-04-02—Filed