FIELD: nuclear power production. SUBSTANCE: method is done in assembly chamber and involves mounting destroyed units of heat elements in sampler tube, removing destroyed heat element, mounting fake heat element instead of it and subsequent fixation. Destroyed heat element before its removal from unit is turned along its longitudinal axis and pulled out of load-bearing grid. When fake heat element is mounted, it is preliminary moved with respect to immovable unit and then unit is rotated with respect to immovable fake heat element. Assembly chamber has set of separable equipment which is mounted in cut lathe of assembly chamber. Jacket of sampler has centering sleeve. Tube of sampler has longitudinal recesses. EFFECT: increased functional capabilities. 3 cl, 19 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND PREPARATION CHAMBER FOR PREPARING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR STORAGE | 2002 |
|
RU2219605C2 |
METHOD AND CHAMBER FOR SEPARATING SPENT TWO- BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR ITS FURTHER DISPOSAL | 1999 |
|
RU2171508C2 |
CHAMBER FOR PREPARATION OF TWO-BEAM CLUSTERS OF FUEL ELEMENTS OF NUCLEAR REACTOR | 1990 |
|
SU1819479A3 |
METHOD AND FACILITY FOR STRIPPING SPENT FUEL ASSEMBLY OF NUCLEAR REACTOR | 2001 |
|
RU2208849C2 |
CHAMBER OF SEPARATION OF TWO-BEAM ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2031460C1 |
PROCESS OF SPENT FUEL ASSEMBLY LOADING INTO CAPSULE FOR FURTHER STORAGE, AND CAPSULE FOR IMPLEMENTING PROCESS | 2006 |
|
RU2328046C2 |
METHOD AND CHAMBER FOR DISMANTLING NUCLEAR REACTOR SPENT FUEL FOR ITS NEXT STORAGE | 2002 |
|
RU2226011C2 |
DEVICE FOR SEPARATING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2069902C1 |
METHOD FOR LAYING OUT TWO-BEAM FUEL ASSEMBLY OF NUCLEAR REACTOR AND LAYOUT DEVICE WHICH IMPLEMENTS SAID METHOD | 1992 |
|
RU2080665C1 |
METHOD FOR CUTTING A TWO-BEAM FUEL ASSEMBLY OF A NUCLEAR REACTOR AND A DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2650187C2 |
Authors
Dates
1997-01-27—Published
1992-04-29—Filed