FIELD: pipeline check-up facilities. SUBSTANCE: wave frequency is selected proceeding from its interaction with medium voids and change in its intensity over 30% is assumed as qualifying frost. EFFECT: improved validity of check due to excitation of microwave in pipeline and recording of changes in its intensity.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TESTING LONG PIPE-LINE FILLED WITH LIQUID PRODUCT HAVING DIELECTRIC PROPERTIES | 1991 |
|
RU2009476C1 |
METHOD FOR ORGANIZATION OF TRANSMISSION OF ELECTROMAGNETIC SIGNALS OVER SINGLE-CONDUCTOR PIPING FILLED WITH DIELECTRIC, SUCH AS PETROLEUM OIL PRODUCTS | 1991 |
|
RU2027260C1 |
SURFACE ELECTROMAGNETIC WAVE GUIDE | 1992 |
|
RU2027259C1 |
PIPELINE ROUTE CONTROL METHOD | 1992 |
|
RU2046311C1 |
GEAR FOR TRANSFER OF ELECTROMAGNETIC ENERGY OVER PIPE-LINE | 1991 |
|
RU2013825C1 |
METHOD FOR BUILDING LINEAR CHANNEL FOR TRANSMISSION OF ELECTROMAGNETIC SIGNALS | 1992 |
|
RU2042989C1 |
DEVICE TO IDENTIFY SOLIDITY OF GAS LIQUID FLOW | 2012 |
|
RU2491534C1 |
METHOD AND DEVICE FOR DETERMINING PARAMETERS OF TWO-PHASE FLOWS OF SOLID MEDIA | 1992 |
|
RU2037811C1 |
PROBE FOR MEASURING DIELECTRIC CONSTANT OF DIELECTRIC PLATES USING MICROWAVE SPECTROSCOPY | 2023 |
|
RU2803975C1 |
METHOD DETERMINING CONTINUITY OF FLOW OF LIQUID IN PIPE-LINE | 1994 |
|
RU2090868C1 |
Authors
Dates
1994-01-30—Published
1991-05-29—Filed