FIELD: electrical engineering. SUBSTANCE: at first stage of starting of electric transmission switches 2 and 12 are cut in and inverter 16 is under shunting condition. Current in A C link grows slowly thanks to reactors 8 and 17 and in additional circuits thanks to use of valves 6 under condition of A C stabilizers. This results in decrease of starting overvoltages. Then C link is cut in by closure of short-circuit switch 7 and switches 4 and 14. EFFECT: enhanced reliability of electrical transmission of pulsating current at starting stage. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CONTROLLED SHUNTING REACTOR | 2015 |
|
RU2592257C1 |
CONTROLLED SHUNTING REACTOR | 2015 |
|
RU2592256C1 |
CONTROLLED THREE-PHASE REACTOR (OPTIONS) | 2022 |
|
RU2778547C1 |
SHUNTING REACTOR WITH CONTROL-SUPPLY WINDING | 2017 |
|
RU2665679C1 |
CONTROLLED REACTOR (OPTIONS) | 2017 |
|
RU2656380C1 |
SHUNTING REACTOR WITH COMBINED EXCITATION (VERSIONS) | 2018 |
|
RU2686301C1 |
MULTI-BRIDGE RECTIFIER | 2019 |
|
RU2717080C1 |
SHUNTING REACTOR WITH COMPENSATION-CONTROL WINDING | 2016 |
|
RU2645752C1 |
HIGH-VOLTAGE SUBSTATION | 2019 |
|
RU2710357C1 |
CONTROLLED SHUNTING REACTOR (VERSIONS) | 2018 |
|
RU2690662C1 |
Authors
Dates
1994-02-15—Published
1992-06-11—Filed