FIELD: hydraulic engineering. SUBSTANCE: structure has X-shaped blocks 1 each of which is assembled in pairs from face and back members 2 and 3 interconnected by pile 4 passing through open vertical channels 5. Members 2 and 3 are identical and are made in the form of a triangle prism which face 6 is made spherical. Prismatic members 2 are made with steps 7 through half of the prism height. Spherical face 6 of each prism has vertical through holes 8 through which additional fixing links 9 are passed. Ground-tight seals 10 are mounted in shaped slots 11 between adjacent blocks 1 in the row. EFFECT: improved structure. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOORING STRUCTURE | 1992 |
|
RU2010908C1 |
SHEET PILING | 1992 |
|
RU2010085C1 |
RETAINING WALL ON ROCKY GROUND | 2008 |
|
RU2382846C1 |
HYDRAULIC STRUCTURE | 0 |
|
SU1423671A1 |
BERTHING STRUCTURE | 1996 |
|
RU2119004C1 |
RETAINING WALL | 0 |
|
SU1476039A1 |
METHOD OF AND SHELL FOR CONSTRUCTING AN EMBEDDED HYDRAULIC STRUCTURE | 0 |
|
SU1476036A1 |
RETAINING STRUCTURE | 0 |
|
SU1807176A1 |
MOORING QUAY AND METHOD FOR ITS CONSTRUCTION | 1992 |
|
RU2032789C1 |
METHOD FOR CONSTRUCTION OF TRANSPORT TUNNEL OF TRANSITION | 2015 |
|
RU2586345C2 |
Authors
Dates
1994-04-15—Published
1992-02-28—Filed