FIELD: moorage construction. SUBSTANCE: mooring structure has a front side wall 1, made as a row of rammed in piles 2, that are supporting closing arch members at the rear. Piles 2 using anchor pullings 4 are connected with anchor supports 5. Each of piles 2 has a paired fastener, that serves a stopper for edges of arch members 3. An arch member if unfolded has form of an equilateral trapezium with thickening of side faces to be connected with fasteners 2. Assembly of a mooring structure is made as follows: piles 2 are sunk in the bottom ground, the anchor stoppers 5 and pullings 4 are mounted. Arch members 3 are inserted in fasteners and the complex is sunk. Reverse filling up of cavities of the mooring structure is exercised. Head 8 and building 10 erection is carried out. EFFECT: mooring structure is used for moorage and poets construction. 2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
RETAINING WALL ON ROCKY GROUND | 2008 |
|
RU2382846C1 |
SHEET PILING | 1992 |
|
RU2010085C1 |
HYDRAULIC STRUCTURE | 1992 |
|
RU2010909C1 |
BERTH AND METHOD OF ITS CONSTRUCTION | 2022 |
|
RU2794790C1 |
SHEET-PILE WALL | 2001 |
|
RU2185476C1 |
METHOD OF RECONSTRUCTION OF BERTHING FACILITIES | 2000 |
|
RU2180028C2 |
MOORING STRUCTURE | 1998 |
|
RU2136814C1 |
MOORING QUAY AND METHOD FOR ITS CONSTRUCTION | 1992 |
|
RU2032789C1 |
END MOST ABUTMENT OF BRIDGE CROSSING FROM WELDED TUBULAR RABBET WITH FUNCTION OF RETAINING WALL | 2013 |
|
RU2543390C2 |
MOORING STRUCTURE ON WEAK GROUND AND METHOD FOR ERECTING THE SAME | 1995 |
|
RU2070249C1 |
Authors
Dates
1994-04-15—Published
1992-02-28—Filed