FIELD: hydraulic engineering. SUBSTANCE: quay comprises piles 1 not deformably connected with one another and united by beam 2, and a flexible structure made up of cross bar 3, anchor plate 4, parallel anchor rods 5 and face wall plates 6 disposed between cross bars 3. Assembly parts 8, 9, 10 and 12 ensure realization of the construction method. EFFECT: improved functional and operating characteristics. 6 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF WHARF EMBANKMENT FROM SPATIAL BLOCKS | 1993 |
|
RU2049190C1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD FOR BUILDING PIER ON ROCK BASE AND PIER ON ROCK BASE OBTAINED BY THIS METHOD | 2020 |
|
RU2757733C1 |
METHOD OF RECONSTRUCTION OF BERTHING FACILITIES | 2000 |
|
RU2180028C2 |
PIPER AND METHOD OF ITS ERECTION | 1993 |
|
RU2034951C1 |
HYDRAULIC STRUCTURE | 2022 |
|
RU2811911C2 |
METHOD FOR REINFORCING WATERFRONT STRUCTURES | 1999 |
|
RU2176006C2 |
METHOD OF RECONSTRUCTING MOORING EMBANKMENT ON WEAK FOUNDATION | 0 |
|
SU1423667A2 |
MOORING EMBANKMENT | 0 |
|
SU1446215A1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
Authors
Dates
1995-04-10—Published
1992-11-18—Filed