FIELD: mining industry. SUBSTANCE: at cutting of a mine working in the bed of rock salt of a composite layer structure the rock is sized on a grate for separation of big lumps of salt (more than 100 mm). They are used for production of salt lick for cattle. The remaining rock is sized according to size - M + 0.2 mm, where M - thickness of the minimum conditional interbed. The thickness of the minimum conditional interbed can be determined according to layer trenching. Sizing according to size - 0.2 mm can be accomplished by screening from the aggregate by air stream. Salt of sizes + M mm - 0.2 mm is dispatched for filling of worked out chambers. Salt - M + 0.2 mm can be used as edible one with crushing of it according to grades with different sizes of grinding. EFFECT: facilitated procedure. 14 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING COMMON SALT | 1994 |
|
RU2083835C1 |
METHOD FOR POTASSIUM MINE PROTECTION AGAINST FLOODING | 2004 |
|
RU2273734C1 |
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
METHOD OF LOCAL PREDICTION OF POTENTIAL ZONE OF CRUSHING OF CASING STRINGS | 2018 |
|
RU2692389C1 |
PROCESS OF WINNING GOLD AT POTASSIUM FIELD | 1999 |
|
RU2170352C1 |
METHOD FOR DEVELOPING DEPOSITS OF POTASSIUM-MAGNESIUM AND ROCK SALTS | 1997 |
|
RU2116445C1 |
METHOD FOR MANUFACTURING OF BUILDING ARTICLES HAVING SPECIAL PURPOSE OF SALT MATERIALS | 1995 |
|
RU2097359C1 |
METHOD OF DEVELOPING OIL AND GOLD DEPOSITS | 1998 |
|
RU2152512C1 |
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
METHOD OF PROSPECTING FOR POTASSIUM SALTS | 0 |
|
SU812912A1 |
Authors
Dates
1994-05-15—Published
1992-03-31—Filed