FIELD: mining industry. SUBSTANCE: partitions are erected in the gob area in the checkered pattern in such a way as to enable the filler material to flow around them and fill the area between the partition under the action of gravity. The distances between the inner surfaces of partitions are determined from the condition of roof span stability. The partitions are provided with a shelf to retain and distribute the filler material. The shelf is disposed between the partition walls and rigidly connected to its butt faces. The shelf may have a convex shape. The filler material forms strips of the fill which outline the unfilled cells of the gob area. The fill acquires a honeycomb structure. EFFECT: improved technique; enlarged operating capabilities. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BURIAL OF SOLID WASTE | 1991 |
|
RU2048213C1 |
METHOD OF MINING COAL SEAMS | 0 |
|
SU1728488A1 |
METHOD OF SETTABLE FILLING-IN OF EXCAVATED AREA | 0 |
|
SU725758A1 |
METHOD OF MINING THICK STEEPLY DIPPING SEAMS WITH FILLING | 0 |
|
SU1710751A1 |
METHOD AND DEVICE FOR PLACING FILLING-UP MATERIALS IN UNDERGROUND WORKINGS AT SHIELD SYSTEM OF MINING | 0 |
|
SU1763678A1 |
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS WITH BACKING WORKED-OUT AREA | 1995 |
|
RU2083833C1 |
METHOD OF WORKING STEEPLY DIPPING BEDS | 0 |
|
SU1710744A1 |
COMPLEX FOR EXTRACTION OF COAL OF THIN AND MEDIUM THICKNESS OF INCLINED AND STEEPLY DIPPING SEAMS | 1991 |
|
RU2006580C1 |
METHOD FOR STEEP COAL SEAMS MINING | 1991 |
|
RU2013547C1 |
METHOD OF VIBRATION COMPACTING OF FILLING AREA | 0 |
|
SU838096A1 |
Authors
Dates
1994-05-30—Published
1991-05-05—Filed