FIELD: civil engineering. SUBSTANCE: method involves putting auxiliary headpiece on free lengths of reinforcing bars and grouting it with a fusible material before bringing the pile to vertical position. After the pile has been driven in, said material is heated until free lengths of reinforcing bars lose adhesion to headpiece , then headpiece is removed. EFFECT: protection of free lengths of reinforcing bars in head end of pile against damage. 2 cl
Title | Year | Author | Number |
---|---|---|---|
ACCESSIONAL PILE HEAD | 1992 |
|
RU2040641C1 |
METHOD OF DRIVING PILE WITH PROTRUDING REINFORCEMENT BARS IN HEAD END | 2016 |
|
RU2625062C1 |
IMPACT-RESISTANT DRIVEN PILE | 2017 |
|
RU2656648C1 |
METHOD FOR MANUFACTURING PRESTRESSED REINFORCED CONCRETE PRODUCTS | 1996 |
|
RU2120527C1 |
MULTI-STORIED BUILDING | 1992 |
|
RU2037617C1 |
0 |
|
SU553331A1 | |
REINFORCED CONCRETE PRESSING PILE AND METHOD OF DRIVING PRESSING REINFORCED CONCRETE PILE | 2016 |
|
RU2648397C1 |
PROCESS OF MANUFACTURE OF HIGH-STRENGTH CONCRETE TUBES AND TUBULAR STRUCTURES | 1994 |
|
RU2089389C1 |
METHOD DETERMINING COEFFICIENT OF RECOVERY OF SPEED OF PARTICLES OF DISPERSIVE PHASE IN MULTIPHASE FLOW | 1994 |
|
RU2087916C1 |
METHOD OF CONSTRUCTING A FOUNDATION | 0 |
|
SU1193239A1 |
Authors
Dates
1994-06-15—Published
1991-10-31—Filed