FIELD: civil engineering. SUBSTANCE: method involves constructing a barrier. For this purpose a trench is formed by explosion. Configuration of the trench shall correspond to position of barrier on ground. A hollow flexible shell is placed on trench bottom and the trench is back-filled with locally-available ground. Next, flexible shell is filled with a medium under pressure to lift the back-filled ground to design height. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PROTECTION AGAINST NATURAL DISASTERS | 1992 |
|
RU2057229C1 |
DEVICE FOR PROTECTION AGAINST SNOW AVALANCHES | 1992 |
|
RU2057228C1 |
METHOD FOR FORMING PROTECTIVE EMBANKMENT AGAINST DISASTERS | 1992 |
|
RU2049847C1 |
PROTECTIVE HYDRAULIC STRUCTURE | 1992 |
|
RU2057838C1 |
CYCLONE CONTROL METHOD | 1993 |
|
RU2062560C1 |
METHOD FOR ATTACHING GRIPPING DEVICE TO FALL PART | 1995 |
|
RU2097077C1 |
FIRE-PROOF PROTECTIVE BARRIER | 1994 |
|
RU2083245C1 |
METHOD OF OBSTRUCTION FRAGMENTS REMOVAL | 1998 |
|
RU2130791C1 |
METHOD FOR PREVENTING FIRE FROM SPREADING ON LAND OF IRREGULAR SHAPE | 1999 |
|
RU2150981C1 |
ASEISMIC STRUCTURE OF BUILDING | 1995 |
|
RU2079626C1 |
Authors
Dates
1994-06-15—Published
1992-06-22—Filed