FIELD: oil and gas industry. SUBSTANCE: lift 1 and washover 2 strings are lowered into well. Hollow circulating valve 3 and a sub 4 with support seat 5 for subsurface pump are installed between said strings. Shoe of washover string 2 is positioned level with oil stratum 13. Pump with extension is lowered into lift string 1 on sucker rods so that extension comes short of washover valve 3. Hole is washed by reverse circulation of hot agent to remove resin and paraffin plugs. Then pump is run in onto support seat 5 and circulating valve 3 is opened by extension. Oil is pumped out of annular space 15 through circulating openings 8 in body 7 of valve 3. EFFECT: higher efficiency of downhole pumping equipment in deep high-viscosity oil wells. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF PRODUCTION OF HIGH-VISCOUS OIL | 1992 |
|
RU2062868C1 |
METHOD OF TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1992 |
|
RU2082877C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 0 |
|
SU1838597A3 |
METHOD FOR OPERATING AND REPAIRING A WELL EQUIPPED WITH A DOWNHOLE ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY A DECREASE IN THE PRODUCTIVITY OF THE BOTTOMHOLE FORMATION ZONE | 2022 |
|
RU2787502C1 |
PROCEDURE FOR WELL OPERATION | 2010 |
|
RU2421602C1 |
METHOD FOR THERMAL EFFECT ON BOTTOMHOLE FORMATION ZONE WITH HIGH-VISCOSITY OIL AND DEVICE THEREFOR | 2015 |
|
RU2582363C1 |
METHOD OF PRODUCTION OF WELL KILLING FLUID | 1992 |
|
RU2082878C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
OIL AND INJECTION WELL REPAIR DEVICE | 2003 |
|
RU2264526C2 |
METHOD OF LIFTING WELL FLUID AND COMBINED WELL LIFT FOR REALIZATION OF THIS METHOD | 1999 |
|
RU2160853C1 |
Authors
Dates
1994-06-15—Published
1991-06-24—Filed