METHOD AND DEVICE FOR RUNNING A HIGH-VISCOSITY OIL WELL Russian patent published in 1994 - IPC

Abstract RU 2014440 C1

FIELD: oil and gas industry. SUBSTANCE: lift 1 and washover 2 strings are lowered into well. Hollow circulating valve 3 and a sub 4 with support seat 5 for subsurface pump are installed between said strings. Shoe of washover string 2 is positioned level with oil stratum 13. Pump with extension is lowered into lift string 1 on sucker rods so that extension comes short of washover valve 3. Hole is washed by reverse circulation of hot agent to remove resin and paraffin plugs. Then pump is run in onto support seat 5 and circulating valve 3 is opened by extension. Oil is pumped out of annular space 15 through circulating openings 8 in body 7 of valve 3. EFFECT: higher efficiency of downhole pumping equipment in deep high-viscosity oil wells. 2 cl, 2 dwg

Similar patents RU2014440C1

Title Year Author Number
PROCESS OF PRODUCTION OF HIGH-VISCOUS OIL 1992
  • Kurtov Veniamin Dmitrievich[Ua]
  • Novomlinskij Ivan Alekseevich[Ua]
  • Zajats Vladimir Petrovich[Ua]
  • Lesovoj Georgij Antonovich[Ua]
RU2062868C1
METHOD OF TREATMENT OF BOTTOM-HOLE FORMATION ZONE 1992
  • Kurtov Veniamin Dmitrievich[Ua]
  • Novomlinskij Ivan Alekseevich[Ua]
  • Zajats Vladimir Petrovich[Ua]
RU2082877C1
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE 0
  • Novomlinskij Ivan Alekseevich
  • Zayats Vladimir Petrovich
  • Kurtov Veniamin Dmitrievich
SU1838597A3
METHOD FOR OPERATING AND REPAIRING A WELL EQUIPPED WITH A DOWNHOLE ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY A DECREASE IN THE PRODUCTIVITY OF THE BOTTOMHOLE FORMATION ZONE 2022
  • Kasimov Ulfat Tagirovich
  • Pishchaeva Alsu Almazovna
RU2787502C1
PROCEDURE FOR WELL OPERATION 2010
  • Jashin Aleksandr Vladimirovich
RU2421602C1
METHOD FOR THERMAL EFFECT ON BOTTOMHOLE FORMATION ZONE WITH HIGH-VISCOSITY OIL AND DEVICE THEREFOR 2015
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2582363C1
METHOD OF PRODUCTION OF WELL KILLING FLUID 1992
  • Kurtov Veniamin Dmitrievich[Ua]
  • Novomlinskij Ivan Alekseevich[Ua]
  • Zajats Vladimir Petrovich[Ua]
  • Lesovoj Georgij Antonovich[Ua]
RU2082878C1
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION 2018
  • Karimov Ruslan Azgatovich
  • Akhmetzyanov Rustem Valizyanovich
  • Taipov Kamil Salavatovich
  • Kiselev Oleg Nikolaevich
  • Fazleev Radik Rashitovich
  • Agliullin Mintalip Mingaleevich
  • Yarullin Rinat Ravilevich
  • Bikkulov Atlas Amirovich
RU2703093C2
OIL AND INJECTION WELL REPAIR DEVICE 2003
  • Terichenko A.N.
RU2264526C2
METHOD OF LIFTING WELL FLUID AND COMBINED WELL LIFT FOR REALIZATION OF THIS METHOD 1999
  • Vasiljadi V.P.
  • Shchukin A.I.
  • Vasiljadi P.V.
  • Sergeeva L.V.
RU2160853C1

RU 2 014 440 C1

Authors

Kurtov V.D.

Novomlinskij I.A.

Zajats V.P.

Dates

1994-06-15Published

1991-06-24Filed