FIELD: reducing pollution of mine water. SUBSTANCE: method involves determining points of inflow of underground water, drilling uprising drain holes at an angle of 30± 10° to prevailing open fissures of water-bearing horizon, setting up casing pipes, installing hydraulic check valves and pressure gauge and connecting to the hole a pipe for delivery of underground water into cleaning facilities or water receivers. Water is taken from water receivers not later than 2 h after their filling. EFFECT: reduction of oxidizing processes achieved by limiting the time of effect of mine medium on underground water entering the mine. 2 cl
Title | Year | Author | Number |
---|---|---|---|
DEHYDRATION METHOD OF MINERAL DEPOSIT | 2010 |
|
RU2448216C2 |
MINE DRAINAGE DURING DEVELOPMENT OF SYNCLINAL COAL DEPOSITS BY COMBINED METHOD | 2016 |
|
RU2622972C1 |
METHOD OF DRYING A DEPOSIT FIELD | 0 |
|
SU1330316A1 |
MINE DRAINAGE DURING DEVELOPMENT OF ANTICLINAL COAL DEPOSITS BY COMBINED METHOD | 2016 |
|
RU2622971C1 |
MINE DRAINAGE IN FLAT AND PITCHING MINING OF COAL DEPOSITS WITH COMBINED METHOD | 2016 |
|
RU2627504C1 |
METHOD OF SHAFT DRAINAGE | 0 |
|
SU1434135A1 |
METHOD OF DISTRIBUTED STORAGE AND USE OF GROUND WATERS IN MINE | 2013 |
|
RU2567564C1 |
METHOD TO PREPARE WATER-LOGGED GAS SATURATED MASSIF OF ROCKS TO MINING BY UNDERGROUND METHOD | 2011 |
|
RU2487997C1 |
SEALING BLOCK FOR UPRIGHT WELLS | 0 |
|
SU1770546A1 |
METHOD OF DRAINING OF TUBELIKE MINERAL DEPOSIT | 2008 |
|
RU2382144C1 |
Authors
Dates
1994-06-15—Published
1990-02-22—Filed