FIELD: mining.
SUBSTANCE: method involves collection of underground water to manifold (17) around development zone (26) of ore (8) deposit (7) so that cone of depression (27) is formed owing to operation of rings (14) of upward discharge wells (15) drilled out of drain annular mine working (6). Inflow is supplied from manifold (17) of mine working (6) by gravity via pipeline (18) of development mine working (4) to sump (19) of well shaft (1) for cleaning and accumulation. Then, some part (28) of accumulated inflow is supplied by means of pump (22) of well water drainage via pipeline (21) to surface (9) into closed pipeline (20), and from it to water bearing horizon (3) through pumping wells (10) pre-drilled from surface (9) within cone of depression (27), thus providing such pumping mode that pumping flow rate Q3 is less than pumping-out flow rate Q0, and heads H3 of underground water in the propagation area of pumped water are less than heads H0 out of this area, i.e. they provide the compliance with conditions Q3<Q0 and H3<H0.
EFFECT: providing environmentally safe utilisation of technogenic drainage water.
1 ex, 6 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
MINE DRAINAGE DURING DEVELOPMENT OF SYNCLINAL COAL DEPOSITS BY COMBINED METHOD | 2016 |
|
RU2622972C1 |
MINE DRAINAGE DURING DEVELOPMENT OF ANTICLINAL COAL DEPOSITS BY COMBINED METHOD | 2016 |
|
RU2622971C1 |
MINE DRAINAGE IN FLAT AND PITCHING MINING OF COAL DEPOSITS WITH COMBINED METHOD | 2016 |
|
RU2627504C1 |
METHOD OF DRAINING OF TUBELIKE MINERAL DEPOSIT | 2008 |
|
RU2382144C1 |
METHOD OF DRAINING FIELD DEPOSIT, SUCH AS TUBULAR, OF USEFUL MINERALS ON TRANSITION FROM ITS OPEN MINING TO UNDERGROUND | 2013 |
|
RU2541341C1 |
METHOD FOR RECONSTRUCTION OF A FLOODED MINE MINED BY OPEN-UNDERGROUND METHOD | 2023 |
|
RU2798370C1 |
METHOD FOR DRAINING MINERAL DEPOSITS | 0 |
|
SU977582A1 |
METHOD OF COMBINED MINING OF FLOODED MINERAL DEPOSITS | 1999 |
|
RU2165018C2 |
COMBINED METHOD OF UNDERGROUND ORE LEACHING | 2009 |
|
RU2406820C1 |
METHOD FOR OPENCAST MINING OF FLOODED MINERAL DEPOSITS | 1994 |
|
RU2114307C1 |
Authors
Dates
2012-04-20—Published
2010-01-20—Filed