FIELD: civil engineering. SUBSTANCE: upper section of pile has the form of a post made of two channels with counteropposed flanges. Portion of pipe of connecting member has horizontal plate on its upper end. Disposed discretely on said plate around the perimeter are vertical ribs adjoining the external side surface of pipe portion. Vertical walls are installed and rigidly secured on upper surface of plate. Channel flanges of post are inserted between walls, rest on plate and are rigidly secured thereto. EFFECT: improved design. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SECTIONAL PRECAST PILE | 1991 |
|
RU2016963C1 |
PILE | 1999 |
|
RU2166027C1 |
GROUND FREEZING DEVICE | 1997 |
|
RU2117096C1 |
METHOD FOR ERECTION OF PILES IN PERMAFROST GROUND | 1997 |
|
RU2117107C1 |
DEVICE FOR PROTECTING SURFACE-LAID PIPELINE FROM GEODYNAMIC MOVEMENTS IN GROUND | 1999 |
|
RU2166026C1 |
GROUND EXPLORATORY DEVICE | 1991 |
|
RU2024680C1 |
BUTT JOINT OF PILE SECTIONS | 0 |
|
SU1114741A1 |
DEVICE FOR PROTECTING PIPELINE AGAINST LANDSLIDE MASSES | 1999 |
|
RU2162497C1 |
FOUNDATION OF MAST | 1998 |
|
RU2147646C1 |
DEVICE FOR MEASUREMENT OF DEFORMATION OF SOIL IN BOREHOLE | 0 |
|
SU1792468A3 |
Authors
Dates
1994-07-30—Published
1991-06-03—Filed