FIELD: construction; hydraulic engineering. SUBSTANCE: drain inverted siphon is laid down in the places of pipelines crossing small river beds. Temporary enclosure is made by means of erection of a partition along the siphon lay-down axis to the trench project mark. Then the siphon is laid down in the trench. EFFECT: increased efficiency of the process. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TRANSITION OF PIPELINE THROUGH WATER OBSTACLE | 2015 |
|
RU2590930C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERWATER PIPE LINE | 1995 |
|
RU2081366C1 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERGROUND PIPE LINE | 2001 |
|
RU2196269C2 |
METHOD OF REPAIRING UNDERGROUND PIPELINE | 2004 |
|
RU2274792C1 |
METHOD OF REPAIRING SAGGING AND DEGRADED PARTS OF UNDERGROUND PIPELINES | 2006 |
|
RU2325579C2 |
CULVERT UNDER THE EMBANKMENT | 2017 |
|
RU2660699C1 |
PIONEER SECTION FOR STRAIGHTENING OPEN STREAM BED | 0 |
|
SU1687708A1 |
METHOD OF ERECTING EARTH DAM ON ALLUVIA-COVERED ROCK BED | 0 |
|
SU1514860A1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
Authors
Dates
1994-07-30—Published
1991-04-22—Filed